Premise

There are a number of tools and scripts that support proposing and review processes at the NRAO and GBO. For the needs of the TTA Tools, we identify three categories for these tools:

  1. The TTA Tools will take responsibility of maintaining the tool
  2. The TTA Tools will interface with an externally maintained tool
  3. The TTA Tools will import a file provided by or export a file for an externally maintained tool

The assignment of the tools to one of these categories needs to be determined and approved.

TTAT Process/PackageDescription of TTAT useFacilityCurrent Responsible Party/ToolTTATNotes
Proposal Process /Allocate and ApprovePrioritizer - process and assign scheduling priorities automaticallyVLASSA/ PHTResponsible
VLBANoneResponsibleDoes not yet exist
GBTNoneResponsibleDoes not yet exist
Produce Pressure Plots VLASSA/ PHT; ?Responsible
VLBASSA/PHT; ?Responsible
GBTGBO/PHTResponsible
Definition of maintenance, sponsored time, carry-over, etcVLAGoogle SheetImport fileTTA tools will ingest a CSV file to specify Time Reservations
VLBA?Import file
GBTGBO/DDSImport file
Identify Source ConflictsVLA
Responsible
VLBA
Responsible
GBT
Responsible
Proposal CreationSensitivity CalculatorVLASSA+NMS/ECTInterface with
VLBA


GBTGBOInterface with
Mapping CalculatorVLANone

VLBA


GBTGBOInterface with
Hardware MappingVLANMS/RCT_2

VLBA


GBT


Close OutSB ValidatorsVLANMSInterface with
Hand off to downstream toolsVLAPBT

VLBA


GBTDSS


Definitions

  • Time Reservation: A block or blocks of time that are expected to be scheduled and therefore reduce the time available for new requests.

    • Maintenance 
    • Carry-over from previous Solicitations
    • Sponsored Time
    • Service Observing