- Date: //date
- Time: 9:00 ET
- Location: nraozoom04
- Sprint Calendar
Agenda:
- Reviewing Observing Type Use Cases; discuss future use case needs. Current Use Cases:
- (VLA) A Faraday Rotation Study of the Stellar Bubble and H II Region Associated with the W4 Complex
- (VLA) Continuum Image of the Orion Nebula
- (GBT) Search for Water Megamasers in 50 Candidate Galaxies
- (GBT) Observations of 3 He + toward the Planetary Nebula IC 418
- (GBT) Search for Pulsars in 20 Candidate Point Sources
- software in scope for TTA Tools
- review proposals to form common use cases Allison Costa
- draft requirements for TTA Tools and discuss with group Allison Costa
- Schedule a meeting with Joe, Patrick, Dane, Stephan, Jeff, TTAT group in Feb Allison Costa
- Contact Joe Masters about interfacing with ECT Allison Costa
- Contact Patrick Brandt about interfacing with RCT_2 and developing hardware configuration algorithms for VLA Allison Costa
- Contact Dane Sizemore for interfacing with GBO's sensitivity calculator, Mapping calculator, Hardware Mapping Allison Costa
- Talk to Robert M about EVN and inspect EVN to understand how to interface with
Met with Joe 2/21/25 - he offered to find documentation on ECT and determine the "state" of its interface. He suggested a research request to SSA planning is the next step if his findings are sufficient. Then, TTAT would prepare requirements to be brought to the SSA planning. I suspect we are at least 6 months from having the requirements in hand.
Open Actions:
Description | Due date | Assignee | Task appears on |
---|---|---|---|
| Allison Costa | 2025-01-10 TTA Requirements Meeting | |
| Allison Costa | 2025-01-10 TTA Requirements Meeting | |
| Allison Costa | 2025-01-10 TTA Requirements Meeting | |
| Allison Costa | 2025-01-10 TTA Requirements Meeting | |
| 2025-01-10 TTA Requirements Meeting | ||
| 2022-09-02 TTA Requirements Meeting | ||
| 2021-12-17 TTA Requirements Meeting |