You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 7 Current »

Agenda:

  • Identify TAC Chair/ add TAC member pro tem
    • Additional TAC panel configuration with hooks to PPR panel configuration to keep PPR review process distinct from Allocate?
  • Design story around v0.2.2
    • Review Process has a standard output called the Proposal Review, which has the scientific merit metric, the comments for PI, etc..
    • (We think) Disposition and Approval Processes need a standard output
      • Proposal Disposition
        • (TAC) Comments for PI
        • (TAC) Internal Comments
        • (Super TAC) Comments for PI
        • (Super TAC) Internal Comments
        • Allocation Dispositions
      • OSC and PPR proposal processes share a requirement to have Comments for PI and Internal Comment from the Allocate phase. Only the PPR proposal process defines the super TAC comments.

Open Actions:

DescriptionDue dateAssigneeTask appears on
2024-06-28 TTA Requirements Meeting
  • Jeff Kern Discuss with ADs the role of the new tools vs existing PHT.
Jeff Kern2023-04-28 TTA Requirements Meeting
  • Discussion on F2F parking lot items
2022-09-02 TTA Requirements Meeting
  • Establish who is Telescope Subsystem Scientist for GBT & VLBA.
2021-12-17 TTA Requirements Meeting

  • No labels