Agenda:

  • Identify TAC Chair/ add TAC member pro tem
    • Additional TAC panel configuration with hooks to PPR panel configuration to keep PPR review process distinct from Allocate?
    • Yes
  • Design story around v0.2.2
    • Review Process has a standard output called the Proposal Review, which has the scientific merit metric, the comments for PI, etc..
    • (We think) Disposition and Approval Processes need a standard output
      • Proposal Disposition
        • (TAC) Comments for PI
        • (TAC) Internal Comments
        • (Super TAC) Comments for PI
        • (Super TAC) Internal Comments
        • Allocation Dispositions
      • OSC and PPR proposal processes share a requirement to have Comments for PI and Internal Comment from the Allocate phase. Only the PPR proposal process defines the super TAC comments.
    • Tentatively, yes

Open Actions:

DescriptionDue dateAssigneeTask appears on
  • draft requirements for TTA Tools and discuss with group Allison Costa 
Allison Costa2025-01-10 TTA Requirements Meeting
Allison Costa2025-01-10 TTA Requirements Meeting
  • Schedule a meeting with Joe, Patrick, Dane, Stephan, Jeff, TTAT group in Feb Allison Costa 
Allison Costa2025-01-10 TTA Requirements Meeting
Allison Costa2025-01-10 TTA Requirements Meeting
  • Contact Patrick Brandt about interfacing with RCT_2 and developing hardware configuration algorithms for VLA Allison Costa 
Allison Costa2025-01-10 TTA Requirements Meeting
  • Contact Dane Sizemore for interfacing with GBO's sensitivity calculator, Mapping calculator, Hardware Mapping Allison Costa 
Allison Costa2025-01-10 TTA Requirements Meeting
  • Talk to Robert M about EVN and inspect EVN to understand how to interface with
2025-01-10 TTA Requirements Meeting
  • Discussion on F2F parking lot items
2022-09-02 TTA Requirements Meeting
  • Establish who is Telescope Subsystem Scientist for GBT & VLBA.
2021-12-17 TTA Requirements Meeting

  • No labels