You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 5 Next »



SRDP Waves:


Wave 1Wave 2Wave 3Wave 4Wave 5
Development20192020202120222023
Operation20202021202220232024

FY21

MilestoneProjectDescription

Target

Date

SRDP

Deliverables

Pipeline

Deliverables

SSA

Deliverables

Notes
5.2.2-13SRAO OperationsCalibration of Multiband DatasetsQ2 FY21Pipeline ValidationPipeline Heuristics (Q1 FY21)

5.2.2-14
Standard Calibration of S-Band observations from the VLAQ3 FY21? Improved RFI Flagging AlgorithmsIf RFI Flagging Algorithms



Pilot Imaging Operations for VLAQ3 FY21Validation of VLA Imaging PipelineVLA Imaging Pipeline (Q1 FY21)

New workflow to support imaging.

Image Ingestion

Pilot to understand resource requirements
5.2.2-15
AUDI Enhancement (Angular Resolution Specification)Q2 FY21Validation of Ang. Resolution SpecificationHeuristic Support (Q1 FY21)Enhancement to AUDI Specification and adaptation to new parameters


Large Program Ingest


Program Support and Product IngestionTo Be Discussed


CARTA Integration


SSA Project at this point.


Image Cutouts



Probably not realistic in FY21

SRAO DevelopmentWave 3: Improved RFI Mitigation for VLA Calibration
Heuristic DefinitionImplementation



Wave 3: Imaging Self Cal (ALMA, maybe VLA)
Heuristic DefinitionImplementation



Wave 3: Recalibration



Probably not mostly SSA Effort


Wave 3: ALMA Group Imaging
Heuristic Definition

Heuristic work, probably not complete
5.2.2-16VLASS OpsVLASS 2.1 Observing CompleteQ1FY21



5.2.2-17
2.1 QL Imaging CompleteQ2FY21





Production of Demonstration set of SE Images



Needs coordination with SCG
5.2.2-18
Production of Validation set of SE ImagesQ4FY21


Needs coordination with SCG


Preparation for VLASS 2.2 OpsQ4FY21




VLASS DevelopmentProduction SE Continuum WorkflowQ1FY21
SE Pipeline UpdateWorkflow DevelopmentSCG as well


SE Polarization ProductQ2FY22


ARDG


Catalog Support
Requirements/ Validation
Almost entirely SSA Effort
5.2.3-19TTA ToolsProject InitiationQ1 FY21

Available Workforce to begin


Logical Architecture CompleteQ4 FY21Requirements and validation
Implementation and Testing








External Goals that Affect SRDP

DMSAuthentication and Authorization Design





CISRed Hat 8



Actual switch is probably FY22
  • No labels