You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 6 Next »

Date:

Time: 10:30 ET (8:30 MT)

ER209





Agenda

  • News

  • Program Administration
  • Science Ready Data Products
    • AAT4.3.4/WS2.8.7/VLASS 2.4.4 deployed
      • Enables cal+img, easy to change default workflow processing settings.
    • Pipeline pending a couple of minor fixes:
    • QA-related pipeline requests in the "no flagging" era
  • VLASS
    • Planning for VLASS-II
      • Now have Texas TACC account set up.
        • Plan sent to Jeff for DMS effort request for VLASS-II
      • VLASS-II priorities:
        • Validate pipeline for 1" cubes with tapering (SECC)
          • Looked into varying cube plane sizes/pixel scales, not much gain.
          • Testing tapering to ~3".
        • Validate and profile hpgawp (GPU) pipeline locally (L4s)
        • Get awp2/awphpg into pipeline: 
          • PIPE-2423 - Getting issue details... STATUS
        • Get awphpg running on different GPUs (specifically H100 Grace Hoppers at TACC).
        • VLASS manager changes/data origin setup.
          • K Scott has "read only" version running, need to get products back.
      • 30 GPUs arrived, 3 installed in nmpost091-093, can run 27 at once in NMTech.
    • Ep3  QL catalog - Dillon to write-up paper with catalogs, we will put them on VLASS website.
    • Steve publishing HIPS to CDS.
    • New Ep1+2 catalog for SECI masks look good, implementation: PIPE-2485 - Getting issue details... STATUS
    • Calibrator uv ranges - Tierra testing.
    • 2.2 SE calibration begun for EBs that need uv-ranges set
    • ML and DA(s) to check 3C138 for pol angle changes prior to 4.1.
  • AOB

Overdue Action Items:

Key Summary Due Assignee original due date
Loading...
Refresh

Upcoming Action Items:

Key Summary Due Assignee original due date
Loading...
Refresh

  • No labels