You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 5 Next »

Agenda:

  • Confirm Conflict Certification (SRP Member action and TTA Group member powers; STT-1146 - Getting issue details... STATUS )
    • For a SRP member, they would not have a “save” option on conflict certification. They can only certify or the changes do not persist.


    • A TTA member should be able to change a conflict designation at any time. We do not need the software to manage if it is the result of the auto conflict process or a user specified conflict, as we trust the TTA member.

    • A TTA member should be able to certify a user's conflict status, if necessary.
  • Is there a restriction on when an ISR can be deleted? (STT-1153)
    • Can a finalized ISR be deleted?
  • Mark F -
  • Allie -

Open Actions:

Description
  • draft requirements for TTA Tools and discuss with group Allison Costa 
Allison Costa2025-01-10 TTA Requirements Meeting
Allison Costa2025-01-10 TTA Requirements Meeting
  • Schedule a meeting with Joe, Patrick, Dane, Stephan, Jeff, TTAT group in Feb Allison Costa 
Allison Costa2025-01-10 TTA Requirements Meeting
Allison Costa2025-01-10 TTA Requirements Meeting
  • Contact Patrick Brandt about interfacing with RCT_2 and developing hardware configuration algorithms for VLA Allison Costa 
Allison Costa2025-01-10 TTA Requirements Meeting
  • Contact Dane Sizemore for interfacing with GBO's sensitivity calculator, Mapping calculator, Hardware Mapping Allison Costa 
Allison Costa2025-01-10 TTA Requirements Meeting
  • Talk to Robert M about EVN and inspect EVN to understand how to interface with
2025-01-10 TTA Requirements Meeting
  • Discussion on F2F parking lot items
2022-09-02 TTA Requirements Meeting
  • Establish who is Telescope Subsystem Scientist for GBT & VLBA.
2021-12-17 TTA Requirements Meeting

  • No labels