Versions Compared
compared with
Key
- This line was added.
- This line was removed.
- Formatting was changed.
Attendees
Attendees | Regrets | Notified |
---|---|---|
Tony Remijan |
Agenda
News
- Program Administration
- Amy and Mark talked with Ylva about SRDP and VLASS transitions to NM Ops.
- NMOps will think about how best to go forward with SRDP for VLA pipeline after the transition in ~ 6 months (e.g. SRDP vs QA-assessed data etc).
- Knowledge transfer for needed for workspaces etc, some transition period would be ideal.
- Is there a plan for VLA pipeline dev. after the transition?
- Not definite plan, will need to find someone in NM to do it, timescale uncertain.
- Punchlist for review
- VLASS transition will probably be a longer (1-2 yr) timescale given that much development work is still needed (remote jobs/RADIAL, SECI-HPG pipeline, cube ingest etc).
- NMOps will think about how best to go forward with SRDP for VLA pipeline after the transition in ~ 6 months (e.g. SRDP vs QA-assessed data etc).
- Requested projects prioritization
- Will raise issue of torque decommissioning at quarterly planning.
- Amy and Mark talked with Ylva about SRDP and VLASS transitions to NM Ops.
- Project Management
- Lustre expansion in NM now scheduled for end of August. Improvements to lustre usage for WS helping, but disk space situation still needs to be monitored.
- Project RADIAL
- Science Ready Data Products
- Pipeline status
- Selfcal bugfixes mostly done
- significant progress on VLA spectral line
- combined continuum/spectral line recipe working.
- SSA Quarterly Planning
- Scripted Downloads
- Legacy VLA reingest
- large VLBA data xfer
- Pipeline status
- VLASS
- 3.2 observing and QL imaging going well (~97% B-config observed, 71% overall; 64% imaged)
- VLASS ran up against its time allocation, needed to be increased to get the last few SBs observed
- SECI QA and reprocessing continuing, 4330 images (24.6%) of 2.1 now done.
- SSA Requested projects
- De-Torquing VLASS & messaging system upgrade; audit & cleanup scripts, QA notes
- Delay SE ingest and remote cluster job running to next quarter.
- 4th Epoch review 17th September
- Link to confluence page
- 1st draft slides due TB Sept 2nd, internal review Sept 6th, slides to reviewers Sept 10th, review Sept 17th.
- AWP2/GPU gridder testing status
- New build of AWP2 out, Juergen testing for VLASS and Lillia for general use. Works in MPI CASA.
- Should also be less bad at hammering lustre than old AWP.
- 3.2 observing and QL imaging going well (~97% B-config observed, 71% overall; 64% imaged)
- CIRADA
- CIRADA requesting effort (as part of in-kind contribution) to help with catalogs since Biny is leaving. Assessing level of effort involved and how to blend it with the VLASS SE catalogs.
- Can get pybdsf to work in Socorro, needs new install though?
- DRAGN finder working in Cville, need to install in Socorro.
- SOM stuff compiling in RHEL8.
- CIRADA requesting effort (as part of in-kind contribution) to help with catalogs since Biny is leaving. Assessing level of effort involved and how to blend it with the VLASS SE catalogs.
- AOB
- ML at IAU next 2 weeks, heading to Socorro 10th-13th Sept.
Overdue Action Items:
Jira | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
|
Upcoming Action Items:
Jira | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
|