Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Date:

Time: 10:30 ET (8:30 MT)

Zoom06 (link) 



Attendees





Agenda

  • News

  • Program Administration 
    • Amy and Mark talked with Ylva about SRDP and VLASS transitions to NM Ops.
      • NMOps will think about how best to go forward with SRDP for VLA pipeline after the transition in ~ 6 months (e.g. SRDP vs QA-assessed data etc). 
        • Knowledge transfer for needed for workspaces etc, some transition period would be ideal. 
        • Is there a plan for VLA pipeline dev. after the transition?
          • Not definite plan, will need to find someone in NM to do it, timescale uncertain. 
        • Punchlist for review 
      • VLASS transition will probably be a longer (1-2 yr) timescale given that much development work is  still needed (remote jobs/RADIAL, SECI-HPG pipeline, cube ingest etc).
    • Requested projects prioritization
      • Will raise issue of torque decommissioning at quarterly planning.
  • Project Management
    • Lustre expansion in NM now scheduled for end of August. Improvements to lustre usage for WS helping, but disk space situation still needs to be monitored.
  • Project RADIAL
  • Science Ready Data Products
    • Pipeline status
      • Selfcal bugfixes mostly done
      • significant progress on VLA spectral line
        • combined continuum/spectral line recipe working.
    • SSA Quarterly Planning
      • Scripted Downloads
      • Legacy VLA reingest
      • large VLBA data xfer
  • VLASS
    • 3.2 observing and QL imaging going well (~97% B-config observed, 71% overall; 64% imaged)
      • VLASS ran up against its time allocation, needed to be increased to get the last few SBs observed
    • SECI QA and reprocessing continuing, 4330 images (24.6%) of 2.1 now done.
    • SSA Requested projects 
      • De-Torquing VLASS & messaging system upgrade; audit & cleanup scripts, QA notes
      • Delay SE ingest and remote cluster job running to next quarter.
    • 4th Epoch review 17th September
      • Link to confluence page
      • 1st draft slides due TB Sept 2nd, internal review Sept 6th, slides to reviewers Sept 10th, review Sept 17th.
    • AWP2/GPU gridder testing status
      • New build of AWP2 out, Juergen testing for VLASS and Lillia for general use. Works in MPI CASA.
      • Should also be less bad at hammering lustre than old AWP.
  • CIRADA
    • CIRADA requesting effort (as part of in-kind contribution) to help with catalogs since Biny is leaving. Assessing level of effort involved and how to blend it with the VLASS SE catalogs.
      • Can get pybdsf to work in Socorro, needs new install though?
      • DRAGN finder working in Cville, need to install in Socorro.
      • SOM stuff compiling in RHEL8.
  • AOB
    • ML at IAU next 2 weeks, heading to Socorro 10th-13th Sept.

Overdue Action Items:

Jira
serverDMS JIRA
columnskey,summary,due,assignee,original due date
maximumIssues20
jqlQueryfilter="SRDP Overdue Action Items"
serverIdeb2e750b-a83a-387e-8345-36eee8a98f01

Upcoming Action Items:

Jira
serverDMS JIRA
columnskey,summary,due,assignee,original due date
maximumIssues20
jqlQueryfilter = "SRDP Upcoming Action Items"
serverIdeb2e750b-a83a-387e-8345-36eee8a98f01