VLASS transition will probably be a longer (1-2 yr) timescale given that much development work is still needed (remote jobs/RADIAL, SECI-HPG pipeline, cube ingest etc).
Requested projects prioritization
Will raise issue of torque decommissioning at quarterly planning.
Project Management
Lustre expansion in NM now scheduled for end of August. Improvements to lustre usage for WS helping, but disk space situation still needs to be monitored.
Project RADIAL
Science Ready Data Products
Pipeline status
Selfcal bugfixes mostly done
significant progress on VLA spectral line
combined continuum/spectral line recipe working.
SSA Quarterly Planning
Scripted Downloads
Legacy VLA reingest
large VLBA data xfer
VLASS
3.2 observing and QL imaging going well (~97% B-config observed, 71% overall; 64% imaged)
VLASS ran up against its time allocation, needed to be increased to get the last few SBs observed
SECI QA and reprocessing continuing, 4330 images (24.6%) of 2.1 now done.
1st draft slides due TB Sept 2nd, internal review Sept 6th, slides to reviewers Sept 10th, review Sept 17th.
AWP2/GPU gridder testing status
New build of AWP2 out, Juergen testing for VLASS and Lillia for general use. Works in MPI CASA.
Should also be less bad at hammering lustre than old AWP.
CIRADA
CIRADA requesting effort (as part of in-kind contribution) to help with catalogs since Biny is leaving. Assessing level of effort involved and how to blend it with the VLASS SE catalogs.
Can get pybdsf to work in Socorro, needs new install though?
DRAGN finder working in Cville, need to install in Socorro.
SOM stuff compiling in RHEL8.
AOB
ML at IAU next 2 weeks, heading to Socorro 10th-13th Sept.