Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Agenda:

  • Identify TAC Chair/ add TAC member pro tem
    • Additional TAC panel configuration with hooks to PPR panel configuration to keep PPR review process distinct from Allocate?
  • Design story around v0.2.2
    • Review Process has a standard output called the Proposal Review, which has the scientific merit metric, the comments for PI, etc..
    • (We think) Disposition and Approval Processes need a standard output
      • Proposal Disposition
        • (TAC) Comments for PI
        • (TAC) Internal Comments
        • (Super TAC) Comments for PI
        • (Super TAC) Internal Comments
        • Allocation Dispositions
      • OSC and PPR proposal processes share a requirement to have Comments for PI and Internal Comment from the Allocate phase. Only the PPR proposal process defines the super TAC comments.
    • Unless this is part of the "Proposal Summary" defined in 2.1.2.5.2 of the Conceptual Architecture already, though it seems to unnecessarily duplicate data

Open Actions:

Task report
pages68321335