Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Agenda:

  • Identify TAC Chair/ add TAC member pro tem
    • Additional TAC panel configuration with hooks to PPR panel configuration to keep PPR review process distinct from Allocate?
  • Design story around v0.2.2
    • Review Process has a standard output called the Proposal Review, which has the scientific merit metric, the comments for PI, etc..
    • (We think) Allocation Process needs a standard output
      • Allocation Review
        • TAC Comments for PI
        • TAC Internal Comments

Open Actions:

Task report
pages68321335