Agenda:

Recap from 8/18

  • Timeline for Internal and External Review of v0.2
    • 9/5
      • Release to production
    • 9/5~9/15:
      • Dana and Allie do final testing; Matthew and Reid on deck for minor fixes + others if needed
      • Mark & Jen go to ngVLA ECT project
      • Pre-flight production for internal review
    • 9/18~9/22
      • Internal testers do Conflict Declarations, ISRs
      • Meet with Chair and 1 SRP member to watch their workflow
      • Prepping for v0.2.1
    • 9/25~9/29
      • Consensus Meeting with Internal reviewers
      • Gather feedback
      • Prepping for v0.2.1
    • 10/2 →
      • prepare high priority bug fixes for production ahead of external review
      • pre-flight production for external review
        • plan for making production available
          • Stephan says make a helpdesk ticket with "Make tta.nrao.edu resolve externally" to add it to the external DNS view. We want to restrict the times it is available though.
        • add external reviewers
      • v0.2.1
    • November
      • External Review
  • https://open-confluence.nrao.edu/x/PQKEBw (Mark F)
  • Consensus Upload Reviews utility - Disable for now.
  • Consensus Internal Comment field requires entry - shouldn't be required.


Open Actions:

Description
  • draft requirements for TTA Tools and discuss with group Allison Costa 
Allison Costa2025-01-10 TTA Requirements Meeting
Allison Costa2025-01-10 TTA Requirements Meeting
  • Schedule a meeting with Joe, Patrick, Dane, Stephan, Jeff, TTAT group in Feb Allison Costa 
Allison Costa2025-01-10 TTA Requirements Meeting
Allison Costa2025-01-10 TTA Requirements Meeting
  • Contact Patrick Brandt about interfacing with RCT_2 and developing hardware configuration algorithms for VLA Allison Costa 
Allison Costa2025-01-10 TTA Requirements Meeting
  • Contact Dane Sizemore for interfacing with GBO's sensitivity calculator, Mapping calculator, Hardware Mapping Allison Costa 
Allison Costa2025-01-10 TTA Requirements Meeting
  • Talk to Robert M about EVN and inspect EVN to understand how to interface with
2025-01-10 TTA Requirements Meeting
  • Discussion on F2F parking lot items
2022-09-02 TTA Requirements Meeting
  • Establish who is Telescope Subsystem Scientist for GBT & VLBA.
2021-12-17 TTA Requirements Meeting