Agenda:

Post meeting notes:

  • Dana mentioned that in addition to meeting with GBO to discuss the PHT requirements, we should collaborated on our approach to Observing Instructions for GBT observing, as we have done some work to support GBT SRDPs and they are starting to work on it as well.
  • We discussed high level stories for Preliminary Allocation Dispositions and TAC requirements. Allie will update the high level stories from that discussion. We also decided that we need to drill down on what is generated and handled by the system in the Facility Reports.
  • We think the versioning requirement that the schedulers want for building the priorities will have significant implications for the design of the system.
  • Drill down on Facility Report contents


Open Actions:

DescriptionDue dateAssigneeTask appears on
  • draft requirements for TTA Tools and discuss with group Allison Costa 
Allison Costa2025-01-10 TTA Requirements Meeting
Allison Costa2025-01-10 TTA Requirements Meeting
  • Schedule a meeting with Joe, Patrick, Dane, Stephan, Jeff, TTAT group in Feb Allison Costa 
Allison Costa2025-01-10 TTA Requirements Meeting
Allison Costa2025-01-10 TTA Requirements Meeting
  • Contact Patrick Brandt about interfacing with RCT_2 and developing hardware configuration algorithms for VLA Allison Costa 
Allison Costa2025-01-10 TTA Requirements Meeting
  • Contact Dane Sizemore for interfacing with GBO's sensitivity calculator, Mapping calculator, Hardware Mapping Allison Costa 
Allison Costa2025-01-10 TTA Requirements Meeting
  • Talk to Robert M about EVN and inspect EVN to understand how to interface with
2025-01-10 TTA Requirements Meeting
  • Discussion on F2F parking lot items
2022-09-02 TTA Requirements Meeting
  • Establish who is Telescope Subsystem Scientist for GBT & VLBA.
2021-12-17 TTA Requirements Meeting