Agenda:

  • https://safe.nrao.edu/wiki/bin/view/Software/GbPhtDocs
  • Edge case
    • Benign:
      • SRP Chair has not assigned Review Types but SRP member has worked far ahead marked ISRs as Saved or Completed.
      • STT-879 - Getting issue details... STATUS says that the Finalize button is available if all of the ISRs with Review Type not equal to None have Review States of Saved or Completed.
      • In this case, the SRP Member's ISRs are all Review Type = None so the Finalize button is available because technically the condition is satisfied. Finalizing does not change the Review States to Finalize so the SRP member will have to go back later and Finalize when the chair is done with assigning Review Types. This is acceptable. We assume the chair and srp members are in communication.
    • Potentially Troublesome:
      • SRP Chair is in the process of assigning Review Types (they have saved but are still working)
      • A SRP Member jumps the gun and hits Finalize and the ISRs with Review Types not equal to None have their Review States changed to Finalized. The SRP chair can no longer modify the Review Type of that SRP member.  STT-871 - Getting issue details... STATUS The solution is that the TTA member will have the power to change the Review Type even if the state is Finalized. This will protect against this case.
    • Probably Benign:
      • STT-933 - Getting issue details... STATUS says that the condition for initiating Consensus Review is that all the ISRs in a panel with a Review Type of P,S,T have Review States of Finalized.
      • Until the Chair assigns Review Types, all Review Types are None so the TTA member could immediately start Consensus. Of course, the TTA member never would do this in practice...

STT-907 - Getting issue details... STATUS

STT-914 - Getting issue details... STATUS

  • When ready, we will do a mock review process at a friday meeting
  • When we release v0.2 for an external group, we will plan to do it together on zoom to help the reviewers navigate the new system

Open Actions:

DescriptionDue dateAssigneeTask appears on
  • draft requirements for TTA Tools and discuss with group Allison Costa 
Allison Costa2025-01-10 TTA Requirements Meeting
Allison Costa2025-01-10 TTA Requirements Meeting
  • Schedule a meeting with Joe, Patrick, Dane, Stephan, Jeff, TTAT group in Feb Allison Costa 
Allison Costa2025-01-10 TTA Requirements Meeting
Allison Costa2025-01-10 TTA Requirements Meeting
  • Contact Patrick Brandt about interfacing with RCT_2 and developing hardware configuration algorithms for VLA Allison Costa 
Allison Costa2025-01-10 TTA Requirements Meeting
  • Contact Dane Sizemore for interfacing with GBO's sensitivity calculator, Mapping calculator, Hardware Mapping Allison Costa 
Allison Costa2025-01-10 TTA Requirements Meeting
  • Talk to Robert M about EVN and inspect EVN to understand how to interface with
2025-01-10 TTA Requirements Meeting
  • Discussion on F2F parking lot items
2022-09-02 TTA Requirements Meeting
  • Establish who is Telescope Subsystem Scientist for GBT & VLBA.
2021-12-17 TTA Requirements Meeting

  • No labels