Agenda:

  • STT-801 - Getting issue details... STATUS
  • F2F Parking Lot

    • Proposal validation at submission and at will requirements.

      • Title, Allocation Request, Capability Request, etc.

    • Logging source of proposal edits?

    • Grace period - proposals go to In Review state at deadline + grace period.

    • When does the review get normalized?

    • What are the review phases?

      • What is the gate for each phase? Manual or automatic?

    • Does the software need to keep track of what has been vetted?

    • Agree on semantics for consensus and individual review uploads.

    • What is the list of tasks TTA Group Members can do? (Solution to TTA Group Member can do everything problem.)

    • Notification details, subsystem doc or system description?

      • Collect notification references in system description and use them to form a table.

  • Add story that would mark the transition between individual reviews and consensus reviews.
    • As a TTA Member, I would like to initiate consensus reviews on a per panel basis if all individual reviews on the panel are complete.
  • Review Diagram white board edition and plantuml edit
  • Discussion on F2F parking lot items

Open Actions:

DescriptionDue dateAssigneeTask appears on
  • draft requirements for TTA Tools and discuss with group Allison Costa 
Allison Costa2025-01-10 TTA Requirements Meeting
Allison Costa2025-01-10 TTA Requirements Meeting
  • Schedule a meeting with Joe, Patrick, Dane, Stephan, Jeff, TTAT group in Feb Allison Costa 
Allison Costa2025-01-10 TTA Requirements Meeting
Allison Costa2025-01-10 TTA Requirements Meeting
  • Contact Patrick Brandt about interfacing with RCT_2 and developing hardware configuration algorithms for VLA Allison Costa 
Allison Costa2025-01-10 TTA Requirements Meeting
  • Contact Dane Sizemore for interfacing with GBO's sensitivity calculator, Mapping calculator, Hardware Mapping Allison Costa 
Allison Costa2025-01-10 TTA Requirements Meeting
  • Talk to Robert M about EVN and inspect EVN to understand how to interface with
2025-01-10 TTA Requirements Meeting
  • Discussion on F2F parking lot items
2022-09-02 TTA Requirements Meeting
  • Establish who is Telescope Subsystem Scientist for GBT & VLBA.
2021-12-17 TTA Requirements Meeting

  • No labels