Meeting Notes:

  • Jeff drew on a white board
  • Potential reworking of terms
    • We talked about renaming some terms in the Observation Planner
      • Partitioning → Phase 1
      • Calibration Strategy → Phase 2
      • Scheduling Strategy → Phase 3
    • Update to Science Target List definition
      • Each row of the Science Target List contains a Source, a Hardware Configuration, a Calibration Strategy, a Scheduling Strategy, and a Requested Time
      • The Calibration Strategy and Scheduling Strategy are inputs and selectors for Phase 1, Phase 2, Phase 3 in the Observation Planner.
    • We are unsure if we need to retain the word Calibration Plan but will for now.
  • The Hardware Configuration does include VLA Configuration and most likely includes stations for the GMVA, for example.
    • We should let the team know about this change.
  • Currently, it is possible to propose for a filler proposal. We have benched this discussion until later.
  • Looking ahead, we may need to "turn the crank" again on the Science Target List after time is allocated to make Observation Specifications that are suitable for the priority, time, or sources the TAC specifies. We should keep this mind as the team moves down stream.
  • Observing OIs
    • A GBT Peak Calibration OI is a type of Pointing Calibration OI


Open Actions:

DescriptionDue dateAssigneeTask appears on
  • draft requirements for TTA Tools and discuss with group Allison Costa 
Allison Costa2025-01-10 TTA Requirements Meeting
Allison Costa2025-01-10 TTA Requirements Meeting
  • Schedule a meeting with Joe, Patrick, Dane, Stephan, Jeff, TTAT group in Feb Allison Costa 
Allison Costa2025-01-10 TTA Requirements Meeting
Allison Costa2025-01-10 TTA Requirements Meeting
  • Contact Patrick Brandt about interfacing with RCT_2 and developing hardware configuration algorithms for VLA Allison Costa 
Allison Costa2025-01-10 TTA Requirements Meeting
  • Contact Dane Sizemore for interfacing with GBO's sensitivity calculator, Mapping calculator, Hardware Mapping Allison Costa 
Allison Costa2025-01-10 TTA Requirements Meeting
  • Talk to Robert M about EVN and inspect EVN to understand how to interface with
2025-01-10 TTA Requirements Meeting
  • Discussion on F2F parking lot items
2022-09-02 TTA Requirements Meeting
  • Establish who is Telescope Subsystem Scientist for GBT & VLBA.
2021-12-17 TTA Requirements Meeting

  • No labels