  • Review reviewer rolls (closing the loop to make sure we have a common understanding) (Mark)
    • Reviewed rolls for reviewers.  Identified that there are two classes of reviewer (Feasibility and Scientific) and subclasses within.
    • Discussed if a SRP Chair is a type of SRP Member, decided to keep the role separate but recognize that most SRP Chairs are also Members.
  • Doodads: Making sure we have common terms (see Dana’s suggestions below) and understanding of what was in the Doodad document so we can start putting it into the algorithm and conceptual architecture so we have a set of requirements for the team to go for a better implementation of the VLA Continuum and GBT use cases.
    • Agreed on general structure and approach.
    • Use name "Observing Instructions" in place of Doodad. 
  • Use of Dendrograms for grouping of phase calibrators and partitioning (Allie)
  • Definitions:
    • Agreed that the user facing object is a Field Source and it contains information both about the field of observation and the astronomical source.
    • Agreed that Rows in the TargetList are Targets
    • Field Source: Specification of astronomical object we want to observe as well as the specification of the region we want to observe.
      • To Do: Clarify the relation between the Field Source and the Pointing Pattern.
    • Pointing Specification: Either a pointing center or in the case of a moving antenna, specification of the antenna motion.  This is what then belongs in the subscan as well as a reference to the FieldSource.


New Actions:

  • Update the conceptual architecture with our better understood hierarchy of reviews. Mark Whitehead
  • Check the system description of feasibility review especially in the case of the Observatory Site Review to ensure it is correct and consistent with the Conceptual Architecture (All)
  • Integrate the "Doodad Doc" into the Algorithm Document, change to Observing Instructions Allison Costa
  • Clarify communication path to SchedSoc Jeff Kern
  • Clarify where the Pointing pattern is in relation to the Field Source 

Open Actions:

DescriptionDue dateAssigneeTask appears on
  • draft requirements for TTA Tools and discuss with group Allison Costa 
Allison Costa2025-01-10 TTA Requirements Meeting
Allison Costa2025-01-10 TTA Requirements Meeting
  • Schedule a meeting with Joe, Patrick, Dane, Stephan, Jeff, TTAT group in Feb Allison Costa 
Allison Costa2025-01-10 TTA Requirements Meeting
Allison Costa2025-01-10 TTA Requirements Meeting
  • Contact Patrick Brandt about interfacing with RCT_2 and developing hardware configuration algorithms for VLA Allison Costa 
Allison Costa2025-01-10 TTA Requirements Meeting
  • Contact Dane Sizemore for interfacing with GBO's sensitivity calculator, Mapping calculator, Hardware Mapping Allison Costa 
Allison Costa2025-01-10 TTA Requirements Meeting
  • Talk to Robert M about EVN and inspect EVN to understand how to interface with
2025-01-10 TTA Requirements Meeting
  • Discussion on F2F parking lot items
2022-09-02 TTA Requirements Meeting
  • Establish who is Telescope Subsystem Scientist for GBT & VLBA.