Date
Goals
- Begin imaging with GPUs
Discussion items
Item | Who | Notes |
---|---|---|
HERA hardware | James | Done: Ticket to rack herastore01d 127013 Ticket to rack herastore02 and shelves 129289 Lustre aocoss13 130466 Peter started installing aocoss13 Jun. 3, 2021 |
Lustre project quotas | jrobnett | Lustre project quotas are still not quite right. 130900 |
VLASS RAM swap | krowe | Move DIMMs from three nodes into six nodes 131614 |
Support PWLWG | jrobnett | Modify pipe submission script, assist as needed with lustre rebalance, determine OPs submission environment |
Write Pipescheduler | jrobnett | Need to write a pipescheduler clone of nodescheduler for NAASC |
More HERA nodes | jrobnett, krowe | new herapost-master and some node herapost nodes. |
Action items
CAS-13342