  • Wrap up projects, prep for GPUs

Discussion items

ItemWhoNotes
HERA ordersJames

The JBOD (po 370942) arrived Jan. 13, 2021 

The 4U lustre OSS will hopefully ship by Feb. 12.

I think everything has arrived.

herastore01krowe

five missing/bad disks on VD_3. helpdesk ticket 127465

Jan. 21, 2020: Install new shelf, (127013) restore data to new volume, use herastore01-4 as scratch when fixed.

nmpost091krowe, Jrobnett

nmpost091 is up at NMT (127446 and 126684).  It's working with a condor requirement.

Requirements = (NMT == True)
+partition = "NMT"
Return VLASS nodes to torquekrowe

Jobs are draining off so we can start returning some nodes.

Tobin imaging stepJames

Need to add imaging step to htcondor workflow (works, waiting for word to roll into git repo)

pbmask=0.4

VLITE mirroringJamesI apparently never wrapped up the automated mirroring of vlite data.
VLASS Lutre errorJamesDAs are seeing a problem moving files from pipeline area to project area ID#128715
Distributed processingFelipeInitiate simplified testing cases  (e.g. mosaic vs awp)