Date and Time
16:00 EDT / 14:00 MDT
Video: https://zoom.us/j/5646363780?pwd=VGxrUGFrTTUrUmZHRGQ1L3poMTN6dz09
Main page: VLASS SE Imaging operations
Roadmap: SE Imaging Operations Roadmap
External processing page: VLASS SE External Processing
HTCondor area: High Throughput Computing with HTCondor
VIP Script timing info: https://docs.google.com/spreadsheets/d/1yGpNNexL9YdEST3-_zyqtNqK2UxSNvmzKFOeRyanOHQ/edit#gid=0
All tickets pertaining to VLASS SE operations should have the VLASS-SE-OPS label. Add VLASS-SE-DISCUSS label if it should be brought up in this meeting
Open Issues
- How to handle Continuum products that may be of use for Cube imaging Decided
- Data staging for SE imaging may not be as simple as a 'restore from acrhive' step. VLASS team is investigating and will define the process, it may just involve remove statwt corrections, may be more. Should this be a VLASS ticket ?
Decisions
- Continuum products needed for Cube imaging will be stored in archive as ancillary products
- No meeting on 8/18, next meeting on 8/25
Agenda
- Pipeline
- <nothing>
- SSA
- List of tickets for VLASS SE Imaging https://open-jira.nrao.edu/issues/?filter=12809
- SCG
- Have initial list of phase centers, hope to start imaging soon
- HTC workflow drawings (all are works in progress)
- DAGman stage dependency map http://www.aoc.nrao.edu/~krowe/vip4.pdf
- VIP DAG workflow (very initial)
- Tclean tool level decomposition https://docs.google.com/drawings/d/1JtN7BcDl_X-dab11b40GMNwhmxxC9vxHFUQTiopFn8g/edit?usp=sharing