You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Next »

Date:

Time: 10:30 ET (8:30 MT)

Zoom06 (link) 



Attendees





Agenda

  • News

  • Program Administration 
  • Project Management
    • Lustre expansion in NM now scheduled for end of August. Improvements to lustre usage for WS helping, but disk space situation still needs to be monitored.
  • Project RADIAL
  • Science Ready Data Products
    • Transition to NMOps needs:
      • Pipeline updates (especially noise estimates PIPE-2131 - Getting issue details... STATUS , disabling of w-terms, testing of MPI CASA in VLA Pipeline).
      • Workspaces Cal+Img capability WS-2320 - Getting issue details... STATUS (WS 2.8.6).
  • VLASS
    • 3.2 observing and QL imaging going well (~20% observed, 10% imaged)
    • SECI QA and reprocessing continuing, 3828 images (22%) of 2.1 now done.
    • Patch next week should fix messaging issues.
    • 4th Epoch review 2nd half of September (most likely last week).
  • CIRADA
    • CIRADA requesting effort (as part of in-kind contribution) to help with catalogs since Biny is leaving. Assessing level of effort involved and how to blend it with the VLASS SE catalogs.
  • AOB
    • ML intermittently out for Jury duty from Jun 24th - August.

Overdue Action Items:

Key Summary Due Assignee original due date
Loading...
Refresh

Upcoming Action Items:

Key Summary Due Assignee original due date
Loading...
Refresh

  • No labels