You are viewing an old version of this page. View the current version.

Compare with Current View Page History

Version 1 Current »

Date and Time

16:00 EDT / 14:00 MDT

Video: https://zoom.us/j/5646363780?pwd=VGxrUGFrTTUrUmZHRGQ1L3poMTN6dz09 

Meeting ID: 564 636 3780
Password: 3780
One tap mobile
+12532158782,,5646363780#,,1#,3780# US (Tacoma)
+13462487799,,5646363780#,,1#,3780# US (Houston)

Dial by your location
+1 253 215 8782 US (Tacoma)
+1 346 248 7799 US (Houston)
+1 669 900 9128 US (San Jose)
+1 301 715 8592 US (Germantown)
+1 312 626 6799 US (Chicago)
+1 646 558 8656 US (New York)
Meeting ID: 564 636 3780
Password: 3780
Find your local number: https://zoom.us/u/ab9WnMz3mT



Main page: VLASS SE Imaging operations

Roadmap: SE Imaging Operations Roadmap

External processing page: VLASS SE External Processing

HTCondor area: High Throughput Computing with HTCondor

VIP Script timing info: https://docs.google.com/spreadsheets/d/1yGpNNexL9YdEST3-_zyqtNqK2UxSNvmzKFOeRyanOHQ/edit#gid=0

All tickets pertaining to VLASS SE operations should have the VLASS-SE-OPS label.  Add VLASS-SE-DISCUSS label if it should be brought up in this meeting


Open Issues

  • Need to discuss loop control for splitting MSes into relevant sq dg.  E.g. a single cluster job that walks through the N phase centers or N jobs submitted per phase center.
    • Note the pipeline currently works on single sq dg.  
  • There is a need to split out per sq dg or all sq dg,  is it necessary to support splitting by tile.  Is a 'tile' an sufficient object within the VLASS manager that can be used to define that split ?
  • How to handle Continuum products that may be of use for Cube imaging


Decisions

  • Plan is to manage loop control as N unique jobs, one per phase center
  • For now SSA plans to support single or multiple phase centers,  per tile and per MS splits.  Implementation may initially only support single phase center and entire MS but ultimately all 4 will be supported
  • No conclusion on products,  ultimately they will probably be ingested as regular products but Jeff wants to investigate more before making a decision.
  • No meeting next week,  next meeting is August 4th in the lead up to the SSA planning meeting.


Agenda (Primarily focused on roadmap)

  • Coordination/Logistics
    • <nothing>
  • Schedule (broad strokes, need to flesh out details)
    • <nothing>
  • SSA
    • Discuss requirements capture and workflow
    • Need list of existing tickets tied to SE imaging (I can go in and add labels)
    • HTCondor effort, when to start, how to coordinate, how to set up test environment (want to start in June, need to discuss what it should look like)
    • How to track SE-continuum products and their possible inclusion in SE-cube imaging (relevant in the short term,  inputs to Cube need to be known so they can drive continuum products  (IDs, name formats etc)
  • SCG
  • Pipeline
    • <nothing>

Action items

  •  James to restructure page and add a Open Issues section.  Loop control for spliting MSes first on list


Key Summary T Created Assignee Status
Loading...
Refresh

  • No labels