Date and Time
16:00 EDT / 14:00 MDT
Video: https://zoom.us/j/5646363780?pwd=VGxrUGFrTTUrUmZHRGQ1L3poMTN6dz09
Main page: VLASS SE Imaging operations
Roadmap: SE Imaging Operations Roadmap
External processing page: VLASS SE External Processing
HTCondor area: High Throughput Computing with HTCondor
VIP Script timing info: https://docs.google.com/spreadsheets/d/1yGpNNexL9YdEST3-_zyqtNqK2UxSNvmzKFOeRyanOHQ/edit#gid=0
All tickets pertaining to VLASS SE operations should have the VLASS-SE-OPS label. Add VLASS-SE-DISCUSS label if it should be brought up in this meeting
Agenda (Primarily focused on roadmap)
- Coordination/Logistics
- <nothing>
- Schedule (broad strokes, need to flesh out details)
- <nothing>
- SSA
- Need list of existing tickets tied to SE imaging (I can go in and add labels)
- Split pipeline between data selection and mstransform and imaging (should this be done in the pipeline recipe, ie hifv_splitms() or some such)
- HTCondor effort, when to start, how to coordinate, how to set up test environment (want to start in June, need to discuss what it should look like)
- How to incorporate into workspacesr vs discrete vlass manager
- How to track SE-continuum products and their possible inclusion in SE-cube imaging (relevant in the short term, inputs to Cube need to be known so they can drive continuum products (IDs, name formats etc)
- SCG
- Overview of Imaging plan and status update
- VIP script converted to HTCondor DAG (Directed Acyclic Graph)
- Transitioning to imager.* tool calls rather than tclean calls
- Loop decomposition nearly done (Link here)
- SPW data decomposition done
- W axis about to commence
- Overview of Imaging plan and status update
- Pipeline
- Need list of existing tickets tied to SE imaging (I can go in and add labels)