The objectives of this review are to ensure that:

  • The L1 capabilities projected for delivery to Pilot Operations are ready for verification and validation.
  • That the software system to be tested is under configuration control and is available in the software test environment.
  • That any items not yet ready for test are identified with a plan to advance them to a state of completion and test prior to delivery to Pilot Operations.
  • That a suite of tests sufficient for verification and validation have been defined.

Review Plan

  • This is an internal SRDP Project Office review, the Review Plan is completely described within this Confluence page
  • The Review is scheduled for May 3, 2019

Participants

  • Project Office: Jeff, John, Mark, Bob
  • DMS: Mark Whitehead, Stephan, Kana, Morgan, Andy, David, James

Artifacts Under Review

DateItem or Event and Deadline for AvailabilityResponsible
5/3/2019




RVTM (Requirements Verification Traceability Matrix)SRDP PM

Test Environment Ready (including configuration list) to support the L1 Verification and Validation

DMS
L2 Verification/Validation CompleteDMS/SRDP Heur.

L1 Verification Plan and Test Procedures Complete for the following:

  • OUS Restores
  • VLA Calibration Pipeline
  • Archive Interface
  • Optimized Imaging

L1 Verification Plan 5.2.2019

DMS

L1 Validation Plan for Heuristics and Operations Test procedures in Jira

LI Validation Plan 5.2.2019

SRDP Heur. / SRDP Ops.
5/8/2019Outstanding Issues and incurred Risk DefinedSRDP PM
Report on Outcome of Review - Delta TRR scheduled for May 17, 2019SRDP PD

Pilot TRR Agenda

  1. SRDP Project Director: Opening Remarks
  2. DMS: Test Environment Ready (including configuration list)

  3. SRDP PM: Present Verification and Validation RVTMs; review process to track V&V against the requirements
  4. DMS:  Present L2 verification and validation completion report, based on Jira ticket status
  5. DMS:  Present L1 Verification Plan and Test Procedures, defined within the set of Jira Test Tickets
  6. SRDP Project Scientist: Present L1 Validation Plan and Test procedures defined within the set of Jira Test Tickets
  7. SRDP Operations Mgr.:  Present Operations Process Test Plan defined within the set of Jira Test Tickets: SRDP-336; SRDP-337; SRDP-338, SRDP-340
  8. SRDP Project Director: Preliminary assessment of Test Readiness, itemize any key blockers or major risk to resolve before proceeding

Outcome of Pilot Ops TRR

Report prepared by SRDP Project Director to include:

  • Outcome of review to be one of the following:

    Initial outcome May 3, was a Fail.  Significant issues were identified in both the test configuration control, and feature completion.  Delta TRR scheduled for May 17 to review progress and assess.

Pilot (Delta) TRR Agenda - May 17, 2019

  1. SRDP Project Director: Opening Remarks
  2. SRDP PM: Review Open Actions from TRR
  3. SRDP PM: Review issues since TRR:

    Issue NumberDescriptionReferencesImpactReported byDateOwner/Assigned in Jira
    1Outstanding requirement to allow selection of pre-release CASA versions within the Archive menu pull down described in SSA-5592 is not in the L1 Doc or model, should this be aded?SSA-5592Revision to Requirements and all downstream artifacts (model, V&V Test, etc), added work to DMSJeff Kern5/13/2019Richard Falardeau 
    2Spectral cutouts within a spectral window (ALMA Cube Imaging) can only be exported to a single file, unsure if additional exports are overwriting a previously generated file.  ALMA exports a single file since cutouts are not supported.PIPE-345Significant inconvenience, workarounds are in discussionJoe Masters / John Tobin5/13/2019Kana
    3The export of calibration products from the VLA pipeline run is addressed in PIPE-47 is not working as expectedPotential blocker to Pilot OpsJohn Tobin5/13/2019Kana
    4SRDP-251 (ALMA Metadata) missing EBs although the DB was reported as copied from productionSRDP-251 (ALMA), SRDP-253 (VLA) & SSA-5583Blocker to Pilot Ops due to partial validationJohn Tobin5/13/2019John Tobin
    5Permissions within archive to download to local directoriesSRDP-209, SRDP-218, SSA-5268Significant inconvenience, no progress since Dec 2018John Tobin5/13/2019John Tobin
  4. Any Other issues?


    1. Pass: All inputs are satisfactory, no additional risks found, proceed as scheduled.
    2. Risk Identified: One or more risks were identified requiring additional attention.  Risk is not deemed sufficient to affect the schedule.  Risk management plan shall be updated.
    3. Partial Pass: One or more risks are likely to impact schedule of the release.  Re-planning to address risk required.
    4. Fail: Sufficient risk identified to halt the release.  Re-planning or rescoping required.

  5. Outcome less than an unconditional "Pass" shall include recommended steps and dates to rectify all discrepancies
  6. SRDP Project Director: Closing Statement / next steps

Mid-Pilot TRR Agenda - July 9, 2019

Previous date for Mid-Pilot Go/No-Go Decision:  July 19, 2019

Revised date for Mid-Pilot Go/No-Go Decision: July 26, 2019

Participants

SRDP Project Office: John Tobin, Mark lacy, Bob Treacy

DMS: Morgan Griffith, Mark Whitehead, Stephan Witz, Kana Sugimoto, Joe Masters

  1. SRDP PM: Review Open Actions required to deliver Pilot Operations Capability to Validation

    1. PIPE-389 - Template recipe: creation of 'mfs' and 'cont' images
      • Status: Ready to validate
    2. SSA-5113 - Epic ticket: Implement ALMA optimized imaging cube capability
      • Review Issues under Epic for Blockers and completion target dates
      • Status: Actions captured to table below
    3. SSA-5330 Epic Ticket: Science Products, Ancillary Products and Associations
      • Review Issues under Epic for completion target dates
      • Status: Actions captured to table below
    4. (ML) Status of SSA-5599 Epic ticket - workaround scripts for Optimized Imaging workflow corresponding to requirements on Requirements for SSA work-around scripts for pilot, including SSA-5604, SSA-5632, SSA-5605.
    5. Identify Configuration changes (i.e. versions reflecting changes from these tickets):  CASA 5.4.2-7; Archive TBD
    6. Any Other issues?
      1. Account permissions etc for DAs and AoD (ML) to run jobs as almapipe. (Status: Captured as M7 in the table below)
    7. Review and Assign Action Items (Status: Actions captured to table below)
    8. Outcome:
      • Not ready for full testing yet, though some tests can be conducted.

      • Pipeline is ready, with a follow up SSA item to incorporate pipeline changes in the template (item M1).

      • SSA is in an all-hands effort to finish the integration work for the product system (SSA-5330), with an estimate of 1-2 days before this is complete.  At that point (July 11) attention can be turned to wrapping up other action items listed below.

      • Changes, particularly to the Request Handler, will require extensive retesting of items previously tested for Pilot.  John is confident that he knows what needs to be tested.

      • Action items in the table below are needed to close the Mid-Pilot TRR and will be reviewed again on July 16.

Issue NumberDescriptionReferencesImpactReported byDateOwner/Assigned in JiraStatus
M1Apply PL changes to templatePIPE-389No CLI E2E testing until we do this, works with bespoke PPRsJohn Tobin7/9SW/Jim Sheckard7/30 - Under validation.

PIPE-389 is done, but John has held off on fully calling it validated until he can throw things through the workflow using its features.


M2

SSA-5175 - CLI


SSA-5175



SSA-5645

CLI functional, but changes needed to make it useful for users; need about half a day to do, once product system workingJohn Tobin7/9Stephan Witz

7/11 - memory management issues?

8/6 - SSA-5645 (Critical) looks like the only unresolved ticket in this epic, Ready to Verify

M3Adding continuum image (switch)

SSA-5532


Generating continuum by default, on/off switch not a blockerJohn Tobin7/9Stephan Witz8/6 - Closed  (smile)
M4GUI Interface for Archive

Stephan will provide ticket number

SSA-5392

SSA-5173

Not implemented on test yet, will be addressed after product system integrationJohn Tobin7/9Stephan Witz/ Reid Givens

8/6 - SSA-5392 (design/prototype) Resolved  (smile)

SSA-5173 - Ready to Validate, LSRK question

M5Need time (day or two) to integrate, then will have statusSSA-5330Integration/delivery of the product system items is an all-hands effort on the part of the SSA team which blocks work on the other tickets. Stephan7/9Stephan Witz

8/6 - 20 tix. 2 completed/resolved, 0 validation, 7 verifying/ready, 10 scheduled, 1 open

M6

SSA-5599, VLA implemented, ALMA in progress,

1) Script to notify Operations manager and DAs when imaging pipeline job is completed and ready for review: status - already exists

2) Script to rerun the imaging pipeline after edits to the PPR and/or extra flagging and/or changes to continuum subtraction: status - not yet done, but could be adapted from existing VLA recaldirs script.

3) Script to ingest image products into the archive and clean up the pipeline directory: status - not yet done (needs product system)

SSA-5599

dependent on SSA-5330


Scripts needed for ALMA, will address when product system items completed.Mark Lacy7/9Stephan Witz

7/29 - Are there critical tasks in this epic, or do they all need to be done?

8/6 - 14 tix, 3 closed/resolved, 4 ready for validation, 2 ready/under verification, 4 scheduled

M7Run jobs as almapipe in CV, as they run as vlapipe, need to check/configure ACLs SSA-5689Operational efficiency, jobs should run the same way in both environmentsMark Lacy7/9Stephan Witz


Mid-Pilot delta TRR Agenda - August 6, 2019

9:30 MT/ 11:30 ET SOC-280, ER-331

VideoHubIP: 192.33.117.12##6519
AudioHub: 434-817-6286


0) General status - Stephan

1) Review List from last TRR (above)

2) Scripts & script tickets - need to separate mid-Pilot script tickets from others: (SSA-5599 - see above, SSA-5621 - this epic has no tickets)

3) Any new things?

4) Next steps


Key Dates (Tentative)

Aug 6 Mid-Pilot Delta TRR (this meeting)

Aug 20 Ends validation window

Aug 22 Operations Readiness Review

Aug 27 Operations Go/NoGo

Participants

SRDP Project Office: John Tobin, Mark Lacy, Bob Treacy

DMS: Morgan Griffith, Mark Whitehead, Stephan Witz, Kana Sugimoto, Joe Masters

Review Open Issues from July 9