You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 2 Current »

Date and Time

16:00 EDT / 14:00 MDT

Video: https://zoom.us/j/5646363780?pwd=VGxrUGFrTTUrUmZHRGQ1L3poMTN6dz09 

Meeting ID: 564 636 3780
Password: 3780
One tap mobile
+12532158782,,5646363780#,,1#,3780# US (Tacoma)
+13462487799,,5646363780#,,1#,3780# US (Houston)

Dial by your location
+1 253 215 8782 US (Tacoma)
+1 346 248 7799 US (Houston)
+1 669 900 9128 US (San Jose)
+1 301 715 8592 US (Germantown)
+1 312 626 6799 US (Chicago)
+1 646 558 8656 US (New York)
Meeting ID: 564 636 3780
Password: 3780
Find your local number: https://zoom.us/u/ab9WnMz3mT



Main page: VLASS SE Imaging operations

Roadmap: SE Imaging Operations Roadmap

External processing page: VLASS SE External Processing

Pipeline version of PI script: https://gitlab.nrao.edu/nrao-pl-devs/vlass-imaging-project

HTCondor area: High Throughput Computing with HTCondor

Image Comparison Tool: Image Comparison

VIP Script timing info: https://docs.google.com/spreadsheets/d/1yGpNNexL9YdEST3-_zyqtNqK2UxSNvmzKFOeRyanOHQ/edit#gid=0

All tickets pertaining to VLASS SE operations should have the VLASS-SE-OPS label.  Add VLASS-SE-DISCUSS label if it should be brought up in this meeting


News

  • NSF proposal to assist with VLASS processing in flight, due 1/21/21
  • Testing suggests that mosaic gridder may be sufficient for most of the sky.  Alternatively AWProject with w=1 may be used.  Likely that AWproject with w=32 will be needed for some areas of the sky.  
  • Anticipate acceptance of mosaic imaging by mid-February

Open Issues

  • How to push for requirements for deciding which gridder or imaging parameters to use ?  Need an early heuristic based on some characteristic, e.g. declination, that triggers more complex imaging ?
  • VLASS team will document official mosaic workflow and make available as soon as possible.

Decisions

  • Preference is to have discrete pipelines for preferred gridder or w parameter rather than an early heuristic.


Agenda

  • Pipeline
    • Status update
  • SSA
    • Validation progress
  • SCG
    • Wrapping up processing 7 square degrees + 7 repeat  
    • 43 sq degrees complete, 30 running.
    • Can we speed up the import step for the split stage.   SCG will examine where time is spent and suggest improvements

Action items

Ticket Discussions

Key Summary T Created Assignee Status
Loading...
Refresh

  • No labels