- Date: //date
- Time: 9:00 ET
- Location: nraozoom04
Attendance:
Agenda:
- Sprint Calendar
- Observatory Site Review Epic
- v0.1 testing
- "A week in the life " - synopsis of recent development activity/decisions (Allie)
- Author/Observatory Copy is accepted nomenclature but comprise of using more colloquial terms in UI in the future
- (open) Where are unit conversions occurring - what is being stored?
- Shortcuts for v0.1
- No selection on units in the import widget. The units on import need to match the default units in the CR
- Relationship between Advanced tab and Performance Parameters is understood but not clear in the UI. Not changing as Reid is of the opinion that this will change as a result of STT-976 anyway.
- Import widget in Advanced Tab works but if any one of the entries does not match, it reports that it couldn't match any of the entries. It still imports as expected though, so the error is wrong. Reid says this will change with the decisions in STT-976.
- Will write into documentation for TTA group that they should save before they navigate out of a CR, as otherwise it may not persist (STT-967 for v0.2).
- calibrate_pol_angle is now triggered by polarization parameters – our (my) mistake in requirements
- Fixed time distribution in VLA scans. Now the rules for science targets are now
- if the requested time is less than 90s, then the entire RT is assigned to 1 scan (subscan)
- if the RT is > 90s, then it is split evenly across 3 scans
- Added additional Phase/amp calibrator scan before first science target, as it was not there before.
- Identified a few more bugs, one is very important.
- Edits to UI text
- Tony R wants distributed peer reviewed to be in scope (eventually) as a possible review process for ttat
Open Actions:
Description | Due date | Assignee | Task appears on |
---|---|---|---|
| 2024-06-28 TTA Requirements Meeting | ||
| Jeff Kern | 2023-04-28 TTA Requirements Meeting | |
| 2022-09-02 TTA Requirements Meeting | ||
| 2021-12-17 TTA Requirements Meeting |