You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 128 Next »

Date

Projects

  • NM Cluster scheduler replacement 
  • ALMA profiling
  • Alamo Starlink  DONE
  • GPU support
  • NAASC scheduler replacement plan POSTPONED
  • VLASS, assist with cube imaging plan DONE
  • Create RADIAL specification

Discussion items

ItemWhoNotes
CARTA glide-insJamesNeed to investigate gliding in based on lack of free slots rather than idle jobs.  Can one query HTCondor for a CARTA-shaped slot (core, mem, disk)?
VLASSkrowe

Sep. 6, 2022 SSA Software release.  Move 15 VLASS nodes (nmpost76..090}) from Torque to HTCondor for workspaces-2.5.  This can be done anytime.

2022-09-08 krowe: moved nmpost{077..090} to HTCondor.  nmpost076 is draining.

ALMA Mitigationkrowe

Do benchmark test on /lustre/naasc for akeply's paper

https://docs.google.com/spreadsheets/d/1Z5m28X1xh_AvFZj857Lzx-gc_cJ3sZZliSJfAXOyYdA/edit#gid=0

2022-09-08: NAASC just added 8 more OSTs.  I should redo my benchmarks and give them to Pat.

Key Summary Updated Assignee P Status
Loading...
Refresh

Action items

CAS-13342


  • No labels