Issue


NameDescriptionWhoTicket(s)StatusDue

V1

SE imaging savemodel(broad scoped ticket for SE development?)JoePIPE-101 (B)

9/27 - Code committed to 5.6.3 branch

10/2 - Ready to validate, waiting for Claire to test; Joe/Brian to coordinate on self-cal issue, tell Claire - PIPE-392 fix is included

10/23 - Progress? - Claire testing:

One blocker so far: Need to write in serial to avoid deadlocks; has a script that runs all the way through, current runs may be done before cluster shutdown, perhaps results by end of next week.



V2Modify pointing tablesIn order for the VLASS imaging to work properly the pointing table needs to be modified to a) remove incorrect values from the encoders and b) change the validity interval to (-1). JoePIPE-434 (B)

9/25 - Blocker for SE imaging

10/2 -Committed, Steve commented that it was reasonable and made a suggestion, which included in Friday build

10/23 - Verifying? - Steve coming up with a verification plan, John will check wth Steve, 1.2 blocker, 1.1. critical


V3Missing EB's follow-upMissing EB's pointed out the need to detect this error...JimSSA-5829

9/25 - Looking at this as time permits, not urgent at this time

10/2 - Utility which detects un-ingested EBs, need to do automatically, tracking down errors

Eventually we will need to re-ingest all VLASS to fix.

Is this applicable to ALMA mosaics (question from John)

Applies to OTF observations, need to determine statement of problem.



V4gaincal segfaultsegfault occurs sporadically, apparently in gaincal; difficult to reproduce reliablyGeorgeCAS-12656?

9/25 - Working on it, but not straightforward;  may need a workaround due to upcoming meetings/travel

10/2 - investigating timestamp & binning precision issues

Brian has started a workaround in pipeline, (won't fix, but should make it more robust)


V5SE calibration example needed for testing

workflows, need for SE example in prod db, Amy generating, SSA will ingest

(longer term, we need a better way to populate test database)

Karlee/StephanVLASS Development Meeting 10/1

10/2 in progress, will take a few days

10/9 Karlee to inform Stephan when calibration ready for ingestion, Stephan to see it done