You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 16 Next »

Fiscal Year 2021 Planning


Roadmap TargetDescriptionTarget DateGroupPop IDDependenciesNotes

SRAO

Heuristics







VLA Calibration Pipeline

Improved RFI Mitigation for VLA Calibration
SRAO

Wave 3 Implementation
VLA Imaging Pipeline

SRAO


ALMA Imaging PipelineImaging Self Cal (ALMA, maybe VLA)
SRAO


Recalibration

Recalibration
SRAO


Minting of DOIs (Requirements)


Q1SRAO


ALMA Multi-configuration imaging

ALMA Group ImagingQ4SRAO

Probably not complete

Catalog Ingestion and Display


Q2SRAO


SRAO

Operations





ALMA Optimized Cube Imaging

Angular Resolution SpecificationQ2SRAO5.2.2-15

VLA Standard Calibration

Calibration of Multiband DatasetsQ2SRAO5.2.2-13Pipeline Heuristics (Q1)
Standard Calibration of S-Band observations from the VLAQ3SRAO5.2.2-14

VLA Imaging OperationsPilot Imaging Operations for VLAQ3SRAO


CARTA IntegrationPhase 1 CARTA integration with ArchiveQ1SSA6.5.39


Workspaces DeliveryQ2SSA6.5.37

Large Project SupportALFALFAIngest of ALFALFA CollectionQ1SSA6.5.38

VLASS








VLASS 2.1 ObservingVLASS 2.1 Observing CompleteQ1VLASS5.2.2-16

Quick Look Image ProductionVLASS 2.1 QL Imaging CompleteQ2VLASS5.2.2-17

SE Continuum Production




HT Condor for VLASS Continuum ImagesQ1SIS5.6.3

Demonstrate 100 deg2 of imagingQ1DMS5.6.45

VLASS SE Imaging Pipeline ReleaseQ2PIPE6.5.30

Demonstrate Operational SE ImagingQ2DMS6.5.46

Production of Validation set of SE ImagesQ4VLASS5.2.2-18

Demonstrate at scale ImagingQ4DMS6.5.47

SE Polarization DevelopmentFull-Pol Primary Beam ModellingQ1ARDG6.5.42


Wide-Field Full Mueller ImagingQ3ARDG6.5.43

VLASS 2.2 ObservingPreparation for VLASS 2.2 OpsQ4VLASS


TTA

Toos


Project InitiationKickoff MeetingQ1TTA

5.2.3-19




Logical ImplementationLogical Architecture CompleteQ3SSA6.5.40

Implementation through Phase 6

Q4






  • No labels