Date:

Time: 10:30 ET (8:30 MT)

ER331





Agenda

  • News

  • Program Administration 
  • Project Management
  • Project RADIAL
  • Science Ready Data Products
    • All jobs (including non-SRDP) now going through workspaces.
      • SRDP vs non-SRDP now clarified (also needed for spectral line pipeline). Requesting SSA help for easy access to the PST database.
        • Anand may be able to help with this.
    • FITS header bug found last Friday, patch in production, need to edit PPRs and (re)run some jobs.
      • Consider testing with fitsverify if issues like this recur.
    • SRDP survey got a total of 66 responses (latest results more-or-less in line with early ones).
      • ML to make a powerpoint and a summary slide of recommendations.
    • Upcoming pipeline patch to fix restores where reform has been run.
  • VLASS
    • 3.1 QL officially done!
      • Need to make 3.2 a bit less drawn out, schedule more cleanup meetings.
    • tclean with GPU gridder out for test by John & Jeurgen.
      • John has got it to run, will send Juergen instructions. Also need to coordinate with K Scott at some point.
    • SECI images: ~800 now ready for QA, Trent working on adapting QL anomaly detection code.
    • Problem with cluster submissions resulting in about half SECI jobs being held, K Scott looking into it.
      • Some progress made this week
    • Tests of new pipeline nearly done, will be needed for some SECI images.
      • Rui making a new package with some CC fixes. NCP testing still to be done.
    • Schedule agreed with SSA for PIMS improvements (~March 2024) and cube ingest (~September 2024)
      • ML to send Amy the list of PIMS improvement tickets.
  • CIRADA
  • AOB
    • AI/ML meeting held, Sergio & the DAs will put together a list of VLASS needs.
    • May eventually need to talk about infrastructure for AI/ML - current NRAO computing and databases not well-suited (few GPUs, no "data lake"). Could think about commercial cloud for prototyping?
    • HTC10 upgrade soon, Amy has been testing
    • RHEL 8 testing to begin in January
    • Tony will check status of DSOC lustre upgrade.

Overdue Action Items:

Key Summary Due Assignee original due date
Loading...
Refresh

Upcoming Action Items:

Key Summary Due Assignee original due date
Loading...
Refresh