Description | JIRA | Slice 1 - v0.2.2 | Slice 2 v0.2.3 - TAC/DR 1 | Slice 3 v0.2.4 - ATM 1 | Slice 4 v0.2.5 - Manual OSDs | Slice 5 v0.2.6 - Algorithms | v0.2.7 - ATMV and AV | v0.3 - final push |
|
---|
Simulate Allocate and Approve | |
| | - Simulate SRP Chair assignment as TAC
- Publish for Disposition button
- creates AV per facility
- creates ATMV per facility and 1 ATM
- publishes AV with ATMV for Disposition
- checks for previously published to Disposition and does not overwrite
- always makes a new AV from AR and new ATMV
- sets Proposal Disposition Comments
 
- Publish for Approval
- same as publish for disposition but for approval

- Publish for Closeout
- same as publish for disposition but prior to publication, it sets the Allocation Disposition States to "Approved"

- Advance to end of Approval
- Does all three steps above

- Predictable data
| | | | | |
TAC Configuration | | - Configure Panel manually for TAC Members+Chair
|
- Import from PPR SRP Chair
| | | | | | |
Scheduler - Source Conflict identification
| | |
|
| |
- automated source conflict identification
| | | |
Scheduler Tools - Construct Preliminary Allocation Dispositions (priorities and time)
- Inputs:
- Proposal Information (current Semester):
- Sources, Resources
- Cluster ID; Time; LST/GST range, Config (VLA); Band;Fixed Date?
- Linear Ranks
- Other:
- Carryover from previous semesters
- Sponsored time
- Maintenance Time
- Fine Tuning inputs
- Manual inspection of carryover etc
- Algorithm to determine scheduling priorities and available time
- How initial priorities are determined are Facility specific
- e.g., VLBA is straight quartiles
- Fine Tuning
- Manual inspection of pressure plot
- Annotate recommendations
- e.g., promote N → C to fill gaps
- Output to TAC
- Cluster ID; Time; LST/GST range, Config (VLA); Band; Priority
- Pressure Plots
- Proposal Summary
- Downloading Proposal Summary can be filtered
- Downloading the Proposal Summaries will produce the same proposal ordering, based on the internal proposal ID.
- Facility Reports
- The Pressure Plot may be downloaded by right click, save on the plot in the UI.
- In some cases, highlighting a portion of the plot only downloads that portion instead of the full plot (unsure if browser dependent)
- The data for the facility report can be downloaded as a csv with a json entry for the data blog.
- Output to Directors Review
- Output to Disposition Letters
| | - Allocation Version
-
  - Create Allocation Dispositions
- Create Observation Specification Dispositions
 - Assigned default Priority of N (default of OSD)

- Create Available Time Model
- Change AD state
- Provide Comments
- Publish to TAC
- Publish to Directors Review
- Publish to Disposition Letters
- UI Prototype (Schedulers Tools)
- Summary view for Allocation Versions and deployment to TAC/DR
- Spot for Proposal Information (AR/OSs/Metadata/Scientific Justification)
- Spot for Proposal Review
- Spot for Feasibility Review
- Spot for ADs and OSDs per Proposal per Facility per version
- Spot for ATM functionality per version (generation)
| | - Allocation Version
- ATM is all available per facility - no precommitts
 - Inspect ATM
- Pressure Plot
- Duplicate an Allocation Version
- Create from ARs
- Manually Assign Scheduling Priorities to ADs
- Bulk assign Scheduling Priorities to ADs
 - See PPR Proposal Process Output (Comments/Scientific Merit Metric)
| - Track if modified OSDs
- "Action Taken Notification System"
- Add OSDs
- Delete OSDs
- Manually Modify OSDs
- Allocation Constraints
  - others expected
- Restore AD
- Science Target List and Scan lists
- Time Reservation refactor
- Pressure Cooker
- respect FE, BE
- respect dates
- Calendar View
- Tabular View
| - Algorithm to determine Scheduling Priorities
- VLA
- VLBA
- GBT
| Calendar Plot Improved Pressure Plots (still no dates) |
|
|
TAC Meeting |
| - Allocation Review Object
- UI Prototype (TAC meeting)
- Spot for Facility Reports
- List of Proposals/Proposal Summary
- Proposal metadata (authors/abstract/title/Joint/Thesis/SRP/Triggered/Large/Total Time/Facilities/Trigger criteria)
- Feasibility Review
- Proposal Review
- Scientific Merit Metric
- Comments to PI
- Internal Comments
- Allocation Review
- Comments to PI (from TAC)
- Internal Comments (from TAC)
- Allocation Requests/OSs
- Allocation Dispositions/OSDs
- Internal Comments from Scheduler
- Scheduling Priority
| - TAC Resources page
- Release TAC meeting UI for TAC
- View unredacted proposals
- See Proposal Summary
- See Proposal Review
- Provide Comments to PI, etc
- Restrict Edit of Comments to TAC Chair
- Display Facility name(s) per proposal
- Display SRP Name per proposal
- Filtering and Sorting on proposals
- TTA member ordering
|
|
|
|
| Resource page with Calendar Plot
Single Facility view on TAC page |
|
Director's Review - Directors Report (statistics_:
- the number of proposals submitted, approved (priority A, B, F), filler (C), rejected (N), and oversubscription (submitted/approved); and by proposal hours: the requested time, the available time, the approved time (priority A, B, F), filler time (C), rejected time (N), and the pressure (requested hours/available hours)
csv with ALLOCATION REQUEST ID, PRINCIPAL INVESTIGATOR, NORMALIZED LINEAR-RANK SCORE, REQUESTED TIME, and APPROVED TIME (broken down by semester) for each SCHEDULING PRIORITY (A, B, C [filler], F [fixed], and N [rejected])
- Approve each OSD
|
| - Publish the Allocation Dispositions for Director's Review
- UI Prototype (Directors Review)
- Spot for Directors Report
- List of Proposals/Proposal Summary
- Proposal metadata (authors/abstract/title/Joint/Thesis/SRP/Triggered/Large/Total Time/Facilities/Trigger criteria)
- Feasibility Review
- Proposal Review
- Scientific Merit Metric
- Comments to PI
- Internal Comments
- Allocation Review
- Comments to PI (from TAC)
- Internal Comments (from TAC)
- Allocation Requests/OSs
- Recommended Allocation Dispositions/OSDs
- Internal Comments from Scheduler
- Scheduling Priority
- Approve Allocations
- Update Scheduling Priorities
| - Directors Review Resources page
- on DR publish, generate proposal summaries and facility reports

| | | | | | |
TTA Member Tools https://science.nrao.edu/observing/proposal-types/24b-tac-report |
|
| Generate Metrics |
|
|
|
|
|
|
Mechanism to track project completion (Need for carryover) Not in Scope |
|
|
|
|
|
|
|
|
|