Background
For Project 22A-126, all 35 EBs had a resource setup that triggered a bug in MCAF software, causing an incomplete SysPower.bin. This caused a highly flagged requantizer gain table, which the pipeline applies by default, resulting in very high total flagging by the end of calibration, often up to 97%. The data is 8-bit and does not require the rq table, so manual calibration is possible (or a modified pipeline).