Background
Project 22A-431 has setups with one continuum spw and one spectral line spw that have nearly the same center frequency. This can result in spix >5 which issues a warning, or even spix >100 which terminates the pipeline run.
Project 22A-431 has setups with one continuum spw and one spectral line spw that have nearly the same center frequency. This can result in spix >5 which issues a warning, or even spix >100 which terminates the pipeline run.
1 Comment
Edward Starr
PIPE-1603 - Getting issue details... STATUS