Date and Time
16:00 EDT / 14:00 MDT
Video: https://zoom.us/j/5646363780?pwd=VGxrUGFrTTUrUmZHRGQ1L3poMTN6dz09
Main page: VLASS SE Imaging operations
Roadmap: SE Imaging Operations Roadmap
External processing page: VLASS SE External Processing
HTCondor area: High Throughput Computing with HTCondor
VIP Script timing info: https://docs.google.com/spreadsheets/d/1yGpNNexL9YdEST3-_zyqtNqK2UxSNvmzKFOeRyanOHQ/edit#gid=0
All tickets pertaining to VLASS SE operations should have the VLASS-SE-OPS label. Add VLASS-SE-DISCUSS label if it should be brought up in this meeting
Open Issues
- Need a test data set that minimizes run times while running through all steps without error. Current test data set with only one SPW fails on mask side. Really want 1/4 or 1/8sq dg image from 1 SPW. Will require regenerating (and documenting) the cfcaches.
- Need to determine whether pybdsf can be run from within CASA, possibly it will work with CASA6 derivitive. .
Decisions
- None
Agenda
- Pipeline
- <nothing>
- SSA
Is the proposed directory structure (/lustre/aoc/cluster/pipeline/vlass_auto/cache/pims/EB/CAL/DEC/RA) acceptable to everyone
What people want to see as directory components for EBs, calibrations, RA and dec for the phase center. Less essential since it will be mostly managed by the tool
what syntax do people want to use on the CLI to input this information.
- SCG
- Have initial list of 7 data sets
- Will begin processing this week.