You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 4 Next »

Date:

Time: 10:00 ET (8:00 MT)

  • Meeting Rooms:
    • Edgemont Road: 230
    • Socorro: 317
  • VideoHubIP: 192.33.117.12##6516
  • AudioHub: 434-817-6283



Agenda

  • News (all)

  • Project Administration (Jeff)
    • VLASS Transition Plan
    • Requirements for SSA Due July 5
      • See below
  • Project Management (Bob)
    • Review Action Items
    • Schedule:
  • TTA Tools (Dana)
  • Heuristics Update (John)
  • Operations Update (Mark)
    • 5 SRDP VLA calibration datasets delivered, 11 more rerunning/awaiting QA
    • need to keep an eye on Cville Lustre usage (now up to 22TB out of 49TB estimated for pilot). NM usage is 37TB (regular+SRDP calibrations and restores)
  • Implementation Update (Morgan/ Mark)
  • Information Technology (David)
  • AOB

Overdue Action Items:

Key Summary Due Assignee original due date
Loading...
Refresh

Upcoming Action Items:

Key Summary Due Assignee original due date
Loading...
Refresh

SSA Development Targets

VLASS:

  • Production Single Epoch Calibration workflow (Type A&B tiles I think)
  • Production Single Epoch Continuum imaging workflow (Parallel, with production source extraction)
    • We will be running this on selected fields within a tile so need a method to edit the list of fields.
    • Must be parallel (in imaging)
  • Design for the future of the VLASS Manager <- architecture project
  • VLASS Collections

SRDP:

  • (Assume that PI driven cubes are already done)
  • Workspace
  • CARTA
  • A3 (design)
  • Alma Image Ingest (standard products)



  • No labels