You are viewing an old version of this page. View the current version.

Compare with Current View Page History

« Previous Version 5 Next »

Agenda:

  • v0.3 planning discussion
    • During ISRs and before Consensus, schedulers identifying Source Conflicts
      • The policy needs to be set to define the criteria for Source Conflicts
      • VLA currently does position and resources
      • GBT currently considers spectral lines
      • This is then available at Consensus
    • Prior to TAC (can be during ISRs and Consensus),
      • schedulers are building the available time model
        • need to be able to modify the model manually the model
      • schedulers prepare the Preliminary Allocation Dispositions for the TAC
        • using the time model and Observations Specifications
    • At a TTA Group members choosing during or after the TAC, the LST pressure plots are generated for the facilities
  • STT-879 - Update Dana on state of Review State = Closed/ReviewType = None
    • Action item to update System Description back to original text
  • Sprint 46 Feedback
    • We have come to consensus that vetting and panel configuration need to be separated more in the UI

Open Actions:

DescriptionDue dateAssigneeTask appears on
2024-06-28 TTA Requirements Meeting
  • Jeff Kern Discuss with ADs the role of the new tools vs existing PHT.
Jeff Kern2023-04-28 TTA Requirements Meeting
  • Discussion on F2F parking lot items
2022-09-02 TTA Requirements Meeting
  • Establish who is Telescope Subsystem Scientist for GBT & VLBA.
2021-12-17 TTA Requirements Meeting

  • No labels