Versions Compared
compared with
Key
- This line was added.
- This line was removed.
- Formatting was changed.
Attendees
Attendees | Regrets | Notified |
---|---|---|
Agenda
News
- Lustre instability at DSOC
- start ramping VLASS back up next week if stable.
- Lustre instability at DSOC
- Program Administration
- DA search status
- Committee met, 10 candidates identified for zoom interview.
- Relative priorities of VLASS items: QL cal/imaging, SE imaging automation, etc.
- AR keen on automation.
- Important to keep up with QL for checking observations and QA automation working well (though tuning possible)
- Need more SE cont. images for "training set", start these in the background, maybe ask DAs to take responsibility/leadership for specific tasks.
- Cube production will need new version of the pipeline (which will have some rough QA in it to deal with bad planes). Earliest would be this summer.
- SSG/CIRADA should be asked where we in the sky we should focus cube productionNeeds some thought, but one possibility would be to work on SE automation during the "lull" between B and BnA in April/May if we are not too far behind on QL.
- Possibility of cross-training DAs between sites.
- ML discussed with Erica, will have some effort available before the ALMA call (10th Apr), training to be arranged. More discussion needed.
- DOIs for VLASS Memos (and other NRAO Memos), eventually for data collections too - discuss with library?
- ML discussed with Lance, library has no budget for 3rd party DOI assignment, and the URLs are "never going to change". AR will follow-up.
- DA search status
- Project Management
- How to add capabilities ("SRDP 2.0") as part of the transition plan to operations.
- What might we include?
- VLA polarization
- Interactions with TTA tools+proposal database e.g. for cal strategies, spectral lines.
- Should consult with users as to their needs.
- What might we include?
- VLASS-CIRADA agreement being revised, current agreement expires 31st March, revision will cover extension through Dec 31st 2025.
- How to add capabilities ("SRDP 2.0") as part of the transition plan to operations.
- RADIAL update
- Dillon and Steve talking to Jennifer about projects for RADIAL students.
- Science Ready Data Products
- Amy set up a meeting to discuss allocations of nodes, HTC/Slurm/Torque etc for 3rd March, 11am ET
- Selfcal is coming..... (starting pipeline testing)
- VLA spectral line data
- VLASS
- AAS ABQ splinter session being planned.
- ML+SSG submitted VLASS pitch to Roman call.
- SE cube demo release next week
- 2008 VLASS3.1 images cached so far. Latency ~24d.
- AOB
Overdue Action Items:
Jira | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Upcoming Action Items:
- ML to talk to Tony Remijan and Library about DOIs for Memos
- AmyK to organize meeting on HTC/Slurm/Torque use on the clusters.
- ML to check with John that automated emails for failed WS cals are on the to-do list for WS2.9