Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Date and Time

16:00 EDT / 14:00 MDT

Video: https://zoom.us/j/5646363780?pwd=VGxrUGFrTTUrUmZHRGQ1L3poMTN6dz09 

...

External processing page: VLASS SE External Processing

Pipeline version of PI script: https://gitlab.nrao.edu/nrao-pl-devs/vlass-imaging-project

HTCondor area: High Throughput Computing with HTCondor

Image Comparison Tool: Image Comparison

VIP Script timing info: https://docs.google.com/spreadsheets/d/1yGpNNexL9YdEST3-_zyqtNqK2UxSNvmzKFOeRyanOHQ/edit#gid=0

All tickets pertaining to VLASS SE operations should have the VLASS-SE-OPS label.  Add VLASS-SE-DISCUSS label if it should be brought up in this meeting


News

Open Issues

  • Need to discuss loop control for splitting MSes into relevant sq dg.  E.g. a single cluster job that walks through the N phase centers or N jobs submitted per phase center.
    • Note the pipeline currently works on single sq dg.  
  • There is a need to split out per sq dg or all sq dg,  is it necessary to support splitting by tile.  Is a 'tile' an sufficient object within the VLASS manager that can be used to define that split ?
  • How to handle Continuum products that may be of use for Cube imaging

Decisions

  • Plan is to manage loop control as N unique jobs, one per phase center
  • For now SSA plans to support single or multiple phase centers,  per tile and per MS splits.  Implementation may initially only support single phase center and entire MS but ultimately all 4 will be supported
  • No conclusion on products,  ultimately they will probably be ingested as regular products but Jeff wants to investigate more before making a decision.
  • No meeting next week,  next meeting is August 4th in the lead up to the SSA planning meeting.

Agenda (Primarily focused on roadmap)

  • Coordination/Logistics
    • <nothing>
  • Schedule (broad strokes, need to flesh out details)
    • <nothing>
  • SSA
    • Discuss requirements capture and workflow
    • Need list of existing tickets tied to SE imaging (I can go in and add labels)
    • HTCondor effort, when to start, how to coordinate, how to set up test environment (want to start in June, need to discuss what it should look like)
    • How to track SE-continuum products and their possible inclusion in SE-cube imaging (relevant in the short term,  inputs to Cube need to be known so they can drive continuum products  (IDs, name formats etc)
  • SCG
  • Pipeline
    • <nothing>

Action items

  •   James to restructure page and add a Open Issues section.  Loop control for spliting MSes first on list
  • SE Imaging Workflow: Is the component list generation step in the workflow or does it only run the pipeline
  • How are SE calibration products handled in the VLASS Manager (I'll explain) 
    • Decision on whether to produce a Mosaic implementation (we will produce one)
    • Pipeline available for testing (available for AWP implementation, Mosaic in progress)
    • SSA PIMS workflow validated (validated)
    • SSA SE Imaging workflow ready for testing   (In progress ?)
    • Pipeline validated  (6/10)
    • Pipeline released   (6/10)
    • SSA SE Imaging workflow validated
    • Begin operations (shooting for June 1st 25th)
    • Migrate above to htcondor (Mid/late August)
    • Accept and archive implemented

Decisions

Agenda

  • Pipeline
  • SSA 
    • PIMS testing in progress
    • SE Imaging workflow testing state 
    • HTCondor design
  • SCG
    • Verification of pipeline vs VIP script in mosaic and AWP (AWP is consistent).  Stalled for now
    • Investigation of  GPU gridder vs CASA underway

Action items

Ticket Discussions

Jira
serverDMS JIRA
columnskey,summary,type,created,assignee,status
maximumIssues20
jqlQueryfilter=12546
serverIdeb2e750b-a83a-387e-8345-36eee8a98f01