Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Agenda:

  • v0.3 planning discussion
    • During ISRs and before Consensus, schedulers identifying Source Conflicts
      • The policy needs to be set to define the criteria for Source Conflicts
      • VLA currently does position and resources
      • GBT currently considers spectral lines
      • This is then available at Consensus
    • Prior to TAC (can be during ISRs and Consensus),
      • schedulers are building the available time model
        • need to be able to modify the model manually the model
      • schedulers prepare the Preliminary Allocation Dispositions for the TAC
        • using the time model and Observations Specifications
    • At a TTA Group members choosing during or after the TAC, the LST pressure plots are generated for the facilities
  • STT-879 - Update Dana on state of Review State = Closed/ReviewType = None
    • Action item to update System Description back to original text
  • Sprint 46 Feedback
    • We have come to consensus that vetting and panel configuration need to be separated more in the UI

Open Actions:

Task report
pages68321335