Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Date and Time

08 16:00 EDT / 14:00 MDT

Video: https://zoom.us/j/5646363780?pwd=VGxrUGFrTTUrUmZHRGQ1L3poMTN6dz09 

...

  • Coordination/Logistics
    • <nothing>
  • Schedule (broad strokes, need to flesh out details)
    • Roadmap (thanks to Mark Whitehead) page set up here following proposed DMS model:  SE Imaging Operations Roadmap
    • Need to work with Pipeline and SSA to further flesh out Roadmap, goal is to have a first full draft done by end of month.  
  • SSA
    • Need list of existing tickets tied to SE imaging (I can go in and add labels)
    • Split pipeline between data selection and mstransform and imaging (should this be done in the pipeline recipe, ie hifv_splitms() or some such)
    • HTCondor effort, when to start, how to coordinate, how to set up test environment (want to start in June, need to discuss what it should look like)
    • How to incorporate into workflow manager vs vlass manager
    • How to track SE-continuum products and their possible inclusion in SE-cube imaging (relevant in the short term,  inputs to Cube need to be known so they can drive continuum products  (IDs, name formats etc)
  • Pipeline
    • Need list of existing tickets tied to SE imaging (I can go in and add labels)
  • SCG

Action items

  •   


Jira
serverDMS JIRA
columnskey,summary,type,created,assignee,status
maximumIssues20
jqlQueryfilter=12546
serverIdeb2e750b-a83a-387e-8345-36eee8a98f01