Epic | Sprints | Start Date | End Date |
---|
STT-434 | 1-3 | | |
STT-438 | 3 | | |
STT-929 | 4-5 | | |
STT-930 | 5-10 | | |
STT-931: | 11 | | |
Gadget |
---|
isConfigured | true |
---|
showVersionName | true |
---|
preferences | rapidViewId=109&showRapidViewName=false&versionId=12304&showVersionName=true&isConfigured=true&refresh=false&=false |
---|
rapidViewId | 109 |
---|
versionId | 12007 |
---|
showRapidViewName | false |
---|
refresh | false |
---|
url | https://open-jira.nrao.edu/rest/gadgets/1.0/g/com.pyxis.greenhopper.jira:greenhopper-gadget-version-report/gadgets/greenhopper-version-report.xml |
---|
|
Jira |
---|
server | DMS JIRA |
---|
columnIds | issuekey,summary,status,resolution,customfield_11200,customfield_11201 |
---|
columns | key,summary,status,resolution,Σ Story Points,Σ Story Points Remain |
---|
maximumIssues | 20 |
---|
jqlQuery | project = STT and type = Epic and fixVersion = "TTA 0.0: Preparation" |
---|
serverId | eb2e750b-a83a-387e-8345-36eee8a98f01 |
---|
|
Jira |
---|
server | DMS JIRA |
---|
columnIds | issuekey,summary,status,resolution,customfield_11200,customfield_11201 |
---|
columns | key,summary,status,resolution,Σ Story Points,Σ Story Points Remain |
---|
maximumIssues | 20 |
---|
jqlQuery | issueFunction in epicsOf("project = STT and fixVersion = \"TTA 0.1: Proposal Creation 1\"") |
---|
serverId | eb2e750b-a83a-387e-8345-36eee8a98f01 |
---|
|
Gadget |
---|
isConfigured | true |
---|
showVersionName | true |
---|
preferences | rapidViewId=109&showRapidViewName=false&versionId=12306&showVersionName=true&isConfigured=true&refresh=false&=false |
---|
rapidViewId | 109 |
---|
versionId | 12007 |
---|
showRapidViewName | false |
---|
refresh | false |
---|
url | https://open-jira.nrao.edu/rest/gadgets/1.0/g/com.pyxis.greenhopper.jira:greenhopper-gadget-version-report/gadgets/greenhopper-version-report.xml |
---|
|
- This is a summary of the phased implementation planning for the new TTA Tools Suite taken from the TTAT Execution Plan.
Phase 1: Logical Design of Solicitation and Proposal Submission
Objectives:
- Design and prototype logical architecture to support solicitation and proposal creation.
Design Goals | Baseline Completion |
---|
1) The system shall support definition of multiple concurrent solicitations. | April 14, 20212) Users shall be able to create proposals containing all proposal information except:- Interaction with the A3 component is not required, proxy user identification is sufficient.
- Capabilities and Allocation Requests are stubs consisting of just the facilities and the time requested.
- Scientific Justification need not be populated with actual PDF files.
|
3) Proposals shall be able to be created, edited, submitted, withdrawn and duplicated. |
4) The ability to validate the software through creation and submission of test proposals and the subsequent removal of proposals when the solicitation is opened shall be demonstrated. |
Phase 2: Logical Design of Observatory Site Review and Allocation Disposition Creation
Objectives: Design and prototype logical architecture to support a review and time allocation process.
Design Goals | Baseline Completion |
---|
1) Review processes shall be able to be configured on a per solicitation basis. Review process will be observatory site review. | April 27, 20212) The results of the review shall be entered and persisted, and an allocation disposition created. - Results shall be entered via a GUI interface. The primary goal is to demonstrate the architectural connections between the UX and application layers.
|
3) Allocation Dispositions shall contain recommended allocation at the Observing Specification Disposition level, although this is simplified with respect to the final state. |
Phase 3: Logical Design of Allocation Approval, Project Creation, and Process Closeout
Objectives: Design and prototype the logical architecture to support the allocation approval, creation of observing projects,
and the closeout of the proposal process.
Design Goals | Baseline Completion |
---|
1) Generation of metrics and reports (subject to available meta-data) | May 11, 20212) Export of csv-formatted spreadsheets containing proposal and allocation information. |
3) Modification of Allocation Dispositions by member of TTA Group. |
4) Recording of acceptance by the director or designee. |
5) Configurable generation and distribution of disposition letters. |
6) Creation of observing projects for proposals with positive disposition. - Note that this is a stub project. The intent is to demonstrate that the path to the telescope systems exist and do a minimal population of the project.
|
Integration: Integration of Phases 1 - 3
Objectives: Internal Software Delivery
Design Goals | Baseline Completion |
---|
1) Integrate Phases 1 - 3 | June 2, 2021 |
2) Demonstrate Functional Walking Skeleton | June 30, 2021