Agenda:
- v0.3 planning discussion
- During ISRs and before Consensus, schedulers identifying Source Conflicts
- The policy needs to be set to define the criteria for Source Conflicts
- VLA currently does position and resources
- GBT currently considers spectral lines
- This is then available at Consensus
- Prior to TAC (can be during ISRs and Consensus),
- schedulers are building the available time model
- need to be able to modify the model manually the model
- schedulers prepare the Preliminary Allocation Dispositions for the TAC
- using the time model and Observations Specifications
- At a TTA Group members choosing during or after the TAC, the LST pressure plots are generated for the facilities
- STT-879 - Update Dana on state of Review State = Closed/ReviewType = None
- Action item to update System Description back to original text
- Sprint 46 Feedback
- We have come to consensus that vetting and panel configuration need to be separated more in the UI
{"serverDuration": 98, "requestCorrelationId": "3f86f12e4615fc40"}