Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Date and Time

Sep 202016:00 EDT / 14:00 MDT

Video: https://zoom.us/j/5646363780?pwd=VGxrUGFrTTUrUmZHRGQ1L3poMTN6dz09 

...

External processing page: VLASS SE External Processing

Pipeline version of PI script: https://gitlab.nrao.edu/nrao-pl-devs/vlass-imaging-project

HTCondor area: High Throughput Computing with HTCondor

Image Comparison Tool: Image Comparison

VIP Script timing info: https://docs.google.com/spreadsheets/d/1yGpNNexL9YdEST3-_zyqtNqK2UxSNvmzKFOeRyanOHQ/edit#gid=0

All tickets pertaining to VLASS SE operations should have the VLASS-SE-OPS label.  Add VLASS-SE-DISCUSS label if it should be brought up in this meeting


News

Open Issues

  • Need to determine whether pybdsf can be run from within CASA,  possibly it will work with CASA6 derivative. 
  • Possibly a problem with the smaller Josh provided data set with CASA6
  • Need to have smaller data set's cfcache's preloaded on VLASS nodes

Decisions

  • Josh Marvil's test data set includes requisite CFCaches.  It reduces flops and memory via fewer channels and smaller image size, completes with 8-way parallelzation through VIP workflow in ~24hours.

Agenda

  • Pipeline
    • Initial CASA6 based tests show pronounced speed up, SCG to help investigate.
  • SSA
    • Is the proposed directory structure (/lustre/aoc/cluster/pipeline/vlass_auto/cache/pims/EB/CAL/DEC/RA) acceptable to everyone

    • What people want to see as directory components for EBs, calibrations, RA and dec for the phase center. Less essential since it will be mostly managed by the tool

    • what syntax do people want to use on the CLI to input this information. 

  • SCG
    • Processing 47 + 7 repeat square degrees in AWS

Action items

  • SE Imaging Workflow: Is the component list generation step in the workflow or does it only run the pipeline
  • How are SE calibration products handled in the VLASS Manager (I'll explain) 
    • Decision on whether to produce a Mosaic implementation (we will produce one)
    • Pipeline available for testing (available for AWP implementation, Mosaic in progress)
    • SSA PIMS workflow validated (validated)
    • SSA SE Imaging workflow ready for testing   (In progress ?)
    • Pipeline validated  (6/10)
    • Pipeline released   (6/10)
    • SSA SE Imaging workflow validated
    • Begin operations (shooting for June 1st 25th)
    • Migrate above to htcondor (Mid/late August)
    • Accept and archive implemented

Decisions

Agenda

  • Pipeline
  • SSA 
    • PIMS testing in progress
    • SE Imaging workflow testing state 
    • HTCondor design
  • SCG
    • Verification of pipeline vs VIP script in mosaic and AWP (AWP is consistent).  Stalled for now
    • Investigation of  GPU gridder vs CASA underway

Action items

Ticket Discussions

Jira
serverDMS JIRA
columnskey,summary,type,created,assignee,status
maximumIssues20
jqlQueryfilter=12546
serverIdeb2e750b-a83a-387e-8345-36eee8a98f01