Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Date and Time

16:00 EDT / 14:00 MDT

...

  • Coordination/Logistics
    • <nothing>
  • Schedule (broad strokes, need to flesh out details)
    • <nothing>
  • SSA
    • Discuss requirements capture and workflow
    • Need list of existing tickets tied to SE imaging (I can go in and add labels)
    • HTCondor effort, when to start, how to coordinate, how to set up test environment (want to start in June, need to discuss what it should look like)
    • How to track SE-continuum products and their possible inclusion in SE-cube imaging (relevant in the short term,  inputs to Cube need to be known so they can drive continuum products  (IDs, name formats etc)
  • SCG
    • Need a drawing tool to describe how to decompose HTCondor DAG steps
      • Current design is 8 steps long each up to 3 steps deep
  • Pipeline
    • <nothing>

Action items

  •   James to restructure page and add a Open Issues section.  Loop control for spliting MSes first on list


Jira
serverDMS JIRA
columnskey,summary,type,created,assignee,status
maximumIssues20
jqlQueryfilter=12546
serverIdeb2e750b-a83a-387e-8345-36eee8a98f01