Date and Time
16:00 EDT / 14:00 MDT
...
- Coordination/Logistics
- <nothing>
- Schedule (broad strokes, need to flesh out details)
- <nothing>
- SSA
- Discuss requirements capture and workflow
- Need list of existing tickets tied to SE imaging (I can go in and add labels)
- HTCondor effort, when to start, how to coordinate, how to set up test environment (want to start in June, need to discuss what it should look like)
- How to track SE-continuum products and their possible inclusion in SE-cube imaging (relevant in the short term, inputs to Cube need to be known so they can drive continuum products (IDs, name formats etc)
- SCG
- Need a drawing tool to describe how to decompose HTCondor DAG steps
- Current design is 8 steps long each up to 3 steps deep
- Need a drawing tool to describe how to decompose HTCondor DAG steps
- Pipeline
- <nothing>
Action items
- James to restructure page and add a Open Issues section. Loop control for spliting MSes first on list
Jira | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
|