Updated 1102.0801.23 2024
Detailed TTA Tools Sprint Feedback Page
...
Table of Contents | ||
---|---|---|
|
Summary of Available Solicitations, Facilities, and Capabilities
...
Section | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
Helpful Files for Testing
File | Updated | Intended Capability | Description |
---|---|---|---|
Sprint 38 | GBT Spectral Line | 50 Field Sources from the Megamaser use case; the use case specifics a rms line sensitivity of 6 mJy | |
Sprint 38 | GBT Spectral Line | 1 Spectral Spec from Megamaser use case; Units are GHz, km/s, km/s (extra spectral spec but can delete) | |
Sprint 38 | GBT Spectral Line | General GBT Spectral Line SS. There are 2 SS in this file: KFPA and Q band | |
Sprint 38 | VLA Continuum | 2 Field Sources from the polarization/continuum use case (W4); use case specifies a rms sensitivity of 100 microJy/bm. RA DEC in hms/dms. | |
Sprint 38 | VLA Continuum | 2 SS (C-, X-band); Units in GHz, GHz, GHz | |
Sprint 39 v0.1.2 | VLA Continuum GBT Spectral Line | General Test Files |
Easy Navigation to Jira Epics and Sprints
Name | Jira | Description | ||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Sprint 48 |
| Prototype Consensus, Finish out ISRs and hook up BE/FE ISRs + Conflicts Feb 28 | ||||||||||||
Sprint 49 |
| Due March 14: Finish hooking up ISRs (Completed/Finalized), | ||||||||||||
Sprint 50 |
| Initiate Consensus, see (SRP) scores as Conflicted and Non Conflicted SRP member, notification on finalized ISRs and less than 3 non conflicted reviewers. | ||||||||||||
Sprint 51 |
| Consensus Comments and consensus related Scores, ability to export a file for ISR comments and score Start of UI overhaul | ||||||||||||
Sprint 52 |
| Start UI/DM/CA reconciliation Utility functions: upload/export ISRs, print proposals BE work on finalizing consensus and generating NRL | ||||||||||||
Sprint 53 |
| Refactoring 1/? | ||||||||||||
Sprint 54 |
| Refactoring 2/? | ||||||||||||
Sprint 55 |
| Refactoring 3/? | ||||||||||||
Sprint 56 |
| Refactoring 4/? | ||||||||||||
Sprint 57 | ||||||||||||||
Sprint 58 |
| connecting FE/BE consensus. System fully connected | ||||||||||||
Sprint 59 |
| bug hunting and final feature push | ||||||||||||
Sprint 60 |
| bug hunting and final feature push | ||||||||||||
Sprint 61 |
| bug hunting; final official sprint of version 0.2 | ||||||||||||
Sprint 62 |
| prototype v0.2.1 interface; RIDs for internal view | ||||||||||||
SRP Process |
| Epic | ||||||||||||
SRP Configuration |
| Epic | ||||||||||||
OSR |
| Epic | ||||||||||||
Proposal Submission |
| Epic | ||||||||||||
Feasibility Reviews |
| Epic | ||||||||||||
V0.2 Bugs |
| Epic | ||||||||||||
Solicitation Configuration |
| Epic | ||||||||||||
Proposal Bugs |
| Epic | ||||||||||||
Label: NotificationRelated |
| Label | ||||||||||||
Label: ConsensusReview |
| Label | ||||||||||||
Label: Conflicts |
| Label | ||||||||||||
Label: Configurability |
| Label | ||||||||||||
Label: ISR |
| Label | ||||||||||||
Label: TTAMember |
| Label | ||||||||||||
Label: SRPChair |
| Label |
Current Report
Landing Page
...
Description | JIRA | Implemented | Last Working | Tested | Status | ||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| Sprint 34 | Sprint 37 | Sprint 37 |
but! it would be nice if there was more feedback when the save successful. |
Notifications
Description | JIRA | Implemented | Last Working | Tested | Status | ||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Notification for a Submitted Proposal
|
| Sprint 47 | Sprint 6168 V0.2 | Sprint 6168 V0.2 |
| ||||||||||||||||||||||||||||||||||||||||||||||||
Notification when Review Configuration is Finalized
|
| Sprint 47 | Sprint 6168 V0.2 | Sprint 6168 V0.2 |
| ||||||||||||||||||||||||||||||||||||||||||||||||
Notification when TTA Member changes Conflict State of Reviewer |
| Sprint 47 | Sprint 6168 V0.2 | Sprint 6168 V0.2 |
| ||||||||||||||||||||||||||||||||||||||||||||||||
Notification when Consensus Review is finalized |
|
| |||||||||||||||||||||||||||||||||||||||||||||||||||
Notification when all ISRs are finalized for a panel |
| Sprint 50 | Sprint 6168 V0.2 | Sprint 6168 V0.2 |
| ||||||||||||||||||||||||||||||||||||||||||||||||
Notification when there are less than N available reviews for a proposal.
|
| Sprint 50 | Sprint 61 V0.2 | Sprint 61 V0.2 |
|
Solicitation Creation
...
Description | JIRA | Implemented | Last Working | Tested | Status | ||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Create a Simple Solicitation from JSON for
not implemented/requirements not in a story:
|
| Sprint 16 | Sprint 16 | Sprint 30 |
| ||||||||||||||||||||||||||
Configure Field Source, SS, PP, CP |
| ||||||||||||||||||||||||||||||
Configure Advance Tab options |
| ||||||||||||||||||||||||||||||
Update/Test a solicitation when a different one is Open and has submitted proposals |
| ||||||||||||||||||||||||||||||
Solicitation Tab | Sprint 61 V0.2 | Sprint 61 V0.2 | Only available to TTA Member | ||||||||||||||||||||||||||||
A Proposal Prefix can be specified per solicitation |
| Sprint 40 | Sprint 40 | Sprint 40 |
| ||||||||||||||||||||||||||
Create a Test Solicitation+Test Proposals | Sprint 46 | Create a simple solicitation with hardcoded Science Categories and Hardware. The Proposal Process can be specified. The number of proposals it creates with 1 of 3 Science categories can be specified. The names and information on the proposal is randomly generated. | |||||||||||||||||||||||||||||
Close Solicitation |
| Sprint 45 | Sprint 61 V0.2 | Sprint 61 V0.2 | Force close a Solicitation, sending all proposals into In Review (if PPR). |
Navigation
...
Description | JIRA/Behavior | Implemented | Last Working | Tested | Status | ||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
As an Author, I would like to view my proposals.
| <Sprint 29 | Sprint 37 | Sprint 37 |
| |||||||||||||||||||||||||||
Saving within a CR | Capability Requests have their own save button. A user is warned if they will lose their changes from navigating.
|
| |||||||||||||||||||||||||||||
Saving and AR | A user is warned if they will lose their changes from navigating away.
|
| |||||||||||||||||||||||||||||
Observation Specification Generation | Prompt warns that user is overwriting their OS. Pops up even if no OS is currently generated or if one cannot be generated (validation needed?) If OS cannot be generated, tab is available but empty.
| <Sprint 35 | Sprint 38 | Sprint 38 |
| ||||||||||||||||||||||||||
Navigate and Edit OS on fresh AR | Not Implemented
| ||||||||||||||||||||||||||||||
Review Tab | Sprint 43 | Sprint 61 V0.2 | Sprint 61 V0.2 |
Can see panels once Review Configuration is Finalized Can see Review Panel as SRP Member for panel which they are assigned to Can see Review Panel as SRP Chair for panel which they are assigned to TTA Member can see both SRP and Chair views |
Submission
Description | JIRA | Implemented | Last Working | Tested | Status | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| Sprint 41 | Sprint 43 | Sprint 43 |
timestamp is in MST, not local? – sprint 43 seems to be local now | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Observatory Copy and Author Copy
|
| Sprint 42 | Sprint 42 | Sprint 42 |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Proposal State Changes Allowed:
Not Allowed:
| Sprint 42 | Sprint | Sprint 42 |
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Print a single or multiple proposals
|
| Sprint 52 |
Back end supports printable view
Navigation to this functionality missing in UI
Print view is missing Observation Specifications (need to tackle larger DM issues maybe) Print view is missing Science Justification (might be a trade off with other issues) |
PPRs
PPRs - Vet Proposals
...
Description | JIRA/Requirements | Implemented | Last Working | Tested | Status | ||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| Sprint 44 | Sprint 61 V0.2 | Sprint 61 V0.2 |
| ||||||||||||||||||||||||||||||||||||||||||||||||
TTA Member can access vetting comments after Configuration in Finalized and forever more. |
PPRs - Review Configuration
...
Description | JIRA | Implemented | Last Working | Tested | Status | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Panels
|
________________________
| Sprint 43 | Sprint 61 V0.2 | Sprint 61 V0.2 |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Finalize Review Configuration
|
| Sprint 45 | Sprint 61 V0.2 | Sprint 61 V0.2 |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Configuration and Vetting is part of the Proposal Process Tab |
PPRs - Conflict Declaration
Description | JIRA | Implemented | Last Working | Tested | Status | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| Sprint 45 | Sprint 61 V0.2 | Sprint 61 V0.2 |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
SRP Reviewer
|
| Sprint 46 | Sprint 61 V0.2 | Sprint 61 V0.2 |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
SRP Chair
|
| Sprint 46/47 | Sprint 61 V0.2 | Sprint 61 V0.2 |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TTA Member
|
| Sprint 45/47 | Sprint 61 V0.2 | Sprint 61 V0.2 |
|
PPRs - Review Type Assignments
Description | JIRA | Implemented | Last Working | Tested | Status | ||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
SRP Chair
| Sprint 46/47 | Sprint 61 V0.2 | Sprint 61 V0.2 |
| |||||||||||||||||||||||||
TTA Member
| Sprint 45/47 | Sprint 61 V0.2 | Sprint 61 V0.2 |
|
PPRs - ISRs
Description | JIRA | Implemented | Last Working | Tested | Status | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
SRP Reviewer
|
| Sprint 46, 47 | Sprint 61 V0.2 | Sprint 61 V0.2 |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
External Reviewer
|
| Sprint 59 | Sprint 61 V0.2 | Sprint 61 V0.2 |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Import/Export ISRs
| Sprint 57? | Sprint 61 V0.2 | Sprint 61 V0.2 |
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TTA Member
|
| Sprint 61 V0.2 | Sprint 61 V0.2 |
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Adding external reviewers as TTA member
| Sprint 59 | Sprint 61 V0.2 | Sprint 61 V0.2 |
PPRs - Consensus
Description | JIRA | Implemented | Last Working | Tested | Status | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
SRP Member
|
| Sprint | Sprint 61 V0.2 | Sprint 61 V0.2 |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
SRP Chair
|
| Sprint 61 V0.2 | Sprint 61 V0.2 |
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
External ISRs
| Sprint 59 | Sprint 61 V0.2 | Sprint 61 V0.2 |
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TTA Member
|
| Sprint 59 | Sprint 61 V0.2 | Sprint 61 V0.2 |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Uploading PPR Proposal Reviews (Removed) As SRP
|
OSR Reviews
Description | JIRA | Implemented | Last Working | Tested | Status | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
|
| Sprint 43 | Sprint 61 V0.2 | Sprint 61 V0.2 |
|
Review Process Simulation Tools
Description | JIRA | Slice 1 | Slice 2Future improvements | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Solicitation
|
|
Status | True | colour | Green | color | green | title | in progress |
|
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Proposal Generation
|
|
|
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Close Solicitation | Use existing structure | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Panel Configuration
|
|
|
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Vetting
|
|
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Finalize Panel Configuration |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Conflicts
|
|
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
ISRs
|
|
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Finalize ISRs per panel, per reviewer, bulk options? |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Initiate Consensus Phase |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Consensus
|
|
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Finalize PPR |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Simulate All |
|
More realistic Simulated Proposals
Jira | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
|
Description | Requirement | Implementation for v0.2.2 | ||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Title | More than 20 characters | Simulated Proposal N for Test Solicitation | ||||||||||||||||||||||||
Abstract | More than 10 characters | Lorem ipsum | ||||||||||||||||||||||||
Authors | not a TTA member | Any user not a TTA member | ||||||||||||||||||||||||
Scientific Justification | pdf less than 4 pages | Stopgap PDF | ||||||||||||||||||||||||
Science Category | One SC | Select from Solicitation definition | ||||||||||||||||||||||||
Allocation Requests | Create 1 to 3 Allocation Requests and randomly select the Facility from the ones defined in the Solicitation. | restricted to VLA, GBT | Capability Request per Allocation Request |
| Create 1 to 3 Allocation Requests and randomly select the Facility from the ones defined Per Allocation Request, create 2 to 10 Capability Requests. The Capability should be randomly selected from what is available for the Facility in the Solicitation. | restricted to VLA Continuum, GBT Spectral Line | ||||||||||||||||||||
Field Sources per Capability Request | Per Capability Request, randomly select 1 Test Field Sources available to the Capability. | Use calibratorList.json to select 1 field source + spectral spec pairs per Capability Request If VLA Continuum
If GBT Spectral Line
| Spectral Specifications per Capability Request | Per Capability Request, randomly select between 1 Test Spectral Specifications available to the Capability. | ||||||||||||||||||||||
Performance parameters per Capability Request | Per Capability Request, set Test Performance Parameters | If VLA Continuum:
If GBT Spectral Line
| ||||||||||||||||||||||||
per Allocation Request
| Per Allocation Request, create 2 to 10 Capability Requests. The Capability should be randomly selected from what is available for the Facility in the Solicitation. | restricted to VLA Continuum, GBT Spectral Line | ||||||||||||||||||||||||
Field Sources Calibration parameters per Capability Request | Per Capability Request, randomly select a Test Calibration Parameter1 Test Field Sources available to the Capability. | Use calibratorList.json to select 1 field source + spectral spec pairs per Capability Request If VLA Continuum:
If GBT Spectral Line:
|
Version 0.3 Outline
| |||||||||||||
Spectral Specifications per Capability Request | Per Capability Request, randomly select between 1 Test Spectral Specifications available to the Capability. | see above for center frequency If VLA Continuum
If GBT Spectral Line
| |||||||||||
Performance parameters per Capability Request | Per Capability Request, set Test Performance Parameters | If VLA Continuum:
If GBT Spectral Line
| |||||||||||
Calibration parameters per Capability Request | Per Capability Request, randomly select a Test Calibration Parameter | If VLA Continuum:
If GBT Spectral Line:
| |||||||||||
Fake Feasibility Reviews
| Pattern |
Scheduler
- Source Conflict identification
Scheduler Tools
- Construct Preliminary Allocation Dispositions (priorities and time)
- Inputs:
- Proposal Information (current Semester):
- Sources, Resources
- Cluster ID; Time; LST/GST range, Config (VLA); Band;Fixed Date?
- Linear Ranks
- Sources, Resources
- Other:
- Carryover from previous semesters
- Sponsored time
- Maintenance Time
- Proposal Information (current Semester):
- Fine Tuning inputs
- Manual inspection of carryover etc
- Algorithm to determine scheduling priorities and available time
- How initial priorities are determined are Facility specific
- e.g., VLBA is straight quartiles
- How initial priorities are determined are Facility specific
- Fine Tuning
- Manual inspection of pressure plot
- Annotate recommendations
- e.g., promote N → C to fill gaps
- Output to TAC
- Cluster ID; Time; LST/GST range, Config (VLA); Band; Priority
- Pressure Plots
- Inputs:
Jira | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
|
Jira | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
|
Jira | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
|
Jira | ||||||||||
---|---|---|---|---|---|---|---|---|---|---|
|
- Version Structure
- Create Allocation Dispositions
Jira server DMS JIRA columnIds issuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolution columns key,summary,type,created,updated,due,assignee,reporter,priority,status,resolution serverId eb2e750b-a83a-387e-8345-36eee8a98f01 key STT-1565
- Create Observation Specification Dispositions
Jira server DMS JIRA columnIds issuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolution columns key,summary,type,created,updated,due,assignee,reporter,priority,status,resolution serverId eb2e750b-a83a-387e-8345-36eee8a98f01 key STT-1566
- Create Available Time Model
Jira server DMS JIRA columnIds issuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolution columns key,summary,type,created,updated,due,assignee,reporter,priority,status,resolution serverId eb2e750b-a83a-387e-8345-36eee8a98f01 key STT-1564
- Create Allocation Dispositions
- Assign Priorities
Jira server DMS JIRA columnIds issuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolution columns key,summary,type,created,updated,due,assignee,reporter,priority,status,resolution serverId eb2e750b-a83a-387e-8345-36eee8a98f01 key STT-1657
- Change AD state
Jira server DMS JIRA columnIds issuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolution columns key,summary,type,created,updated,due,assignee,reporter,priority,status,resolution serverId eb2e750b-a83a-387e-8345-36eee8a98f01 key STT-1658
- Provide Comments
Jira server DMS JIRA columnIds issuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolution columns key,summary,type,created,updated,due,assignee,reporter,priority,status,resolution serverId eb2e750b-a83a-387e-8345-36eee8a98f01 key STT-1575
- Publish to TAC
Jira server DMS JIRA columnIds issuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolution columns key,summary,type,created,updated,due,assignee,reporter,priority,status,resolution serverId eb2e750b-a83a-387e-8345-36eee8a98f01 key STT-1568 Jira server DMS JIRA columnIds issuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolution columns key,summary,type,created,updated,due,assignee,reporter,priority,status,resolution serverId eb2e750b-a83a-387e-8345-36eee8a98f01 key STT-1570
- Publish to Directors Review
Jira server DMS JIRA columnIds issuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolution columns key,summary,type,created,updated,due,assignee,reporter,priority,status,resolution serverId eb2e750b-a83a-387e-8345-36eee8a98f01 key STT-1569
- UI Prototype (Schedulers Tools)
- Summary view for Allocation Versions and deployment to TAC/DR
- Spot for Proposal Information (AR/OSs/Metadata/Scientific Justification)
- Spot for Proposal Review
- Spot for Feasibility Review
- Spot for ADs and OSDs per Proposal per Facility per version
- Spot for ATM functionality per version (generation)
- ATM is all available per facility - no precommitts
Jira server DMS JIRA columnIds issuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolution columns key,summary,type,created,updated,due,assignee,reporter,priority,status,resolution serverId eb2e750b-a83a-387e-8345-36eee8a98f01 key STT-1332 Jira server DMS JIRA columnIds issuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolution columns key,summary,type,created,updated,due,assignee,reporter,priority,status,resolution serverId eb2e750b-a83a-387e-8345-36eee8a98f01 key STT-1563 - Inspect ATM
- Pressure Plot
Jira server DMS JIRA columnIds issuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolution columns key,summary,type,created,updated,due,assignee,reporter,priority,status,resolution serverId eb2e750b-a83a-387e-8345-36eee8a98f01 key STT-1573
- Allocation Requests/OS/Blank ATM
Jira server DMS JIRA columnIds issuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolution columns key,summary,type,created,updated,due,assignee,reporter,priority,status,resolution serverId eb2e750b-a83a-387e-8345-36eee8a98f01 key STT-1567
- another Allocation Version (duplicate)
Jira server DMS JIRA columnIds issuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolution columns key,summary,type,created,updated,due,assignee,reporter,priority,status,resolution serverId eb2e750b-a83a-387e-8345-36eee8a98f01 key STT-1562
- See PPR Proposal Process Output (Comments/Score)
- Assign a Preliminary Scheduling Priority per OSD
- Record comments
Jira server DMS JIRA columnIds issuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolution columns key,summary,type,created,updated,due,assignee,reporter,priority,status,resolution serverId eb2e750b-a83a-387e-8345-36eee8a98f01 key STT-1575
- Write Narrative per Facility
- Bare bones, capture comments
- Create Proposal Summary
- Bare bones
- Allocation Review Object
- TAC Comments to PI
Jira server DMS JIRA columnIds issuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolution columns key,summary,type,created,updated,due,assignee,reporter,priority,status,resolution serverId eb2e750b-a83a-387e-8345-36eee8a98f01 key STT-1574
- TAC Comments to PI
- UI Prototype (TAC meeting)
- Spot for Facility Reports
- List of Proposals/Proposal Summary
- Proposal metadata (authors/abstract/title/Joint/Thesis/SRP/Triggered/Large/Total Time/Facilities/Trigger criteria)
- Feasibility Review
- Proposal Review
- Scientific Merit Metric
- Comments to PI
- Internal Comments
- Allocation Review
- Comments to PI (from TAC)
- Internal Comments (from TAC)
- Allocation Requests/OSs
- Allocation Dispositions/OSDs
- Internal Comments from Scheduler
- Scheduling Priority
- Produce Reports for TAC from an Allocation Version
Jira server DMS JIRA columnIds issuekey,summary,issuetype,created,updated,duedate,assignee,reporter,priority,status,resolution columns key,summary,type,created,updated,due,assignee,reporter,priority,status,resolution serverId eb2e750b-a83a-387e-8345-36eee8a98f01 key STT-1572
Director's Review
- Directors Report (statistics_:
- the number of proposals submitted, approved (priority A, B, F), filler (C), rejected (N), and oversubscription (submitted/approved); and by proposal hours: the requested time, the available time, the approved time (priority A, B, F), filler time (C), rejected time (N), and the pressure (requested hours/available hours)
csv with
ALLOCATION REQUEST ID, PRINCIPAL INVESTIGATOR, NORMALIZED LINEAR-RANK SCORE, REQUESTED TIME, and APPROVED TIME (broken down by semester) for each SCHEDULING PRIORITY (A, B, C [filler], F [fixed], and N [rejected])
- Approve each OSD
- Publish the Allocation Dispositions for Director's Review
- Approve Allocation Dispositions/ OSDs
- UI Prototype (Directors Review)
- Spot for Directors Report
- List of Proposals/Proposal Summary
- Proposal metadata (authors/abstract/title/Joint/Thesis/SRP/Triggered/Large/Total Time/Facilities/Trigger criteria)
- Feasibility Review
- Proposal Review
- Scientific Merit Metric
- Comments to PI
- Internal Comments
- Allocation Review
- Comments to PI (from TAC)
- Internal Comments (from TAC)
- Allocation Requests/OSs
- Recommended Allocation Dispositions/OSDs
- Internal Comments from Scheduler
- Scheduling Priority
- Approve Allocations
- Update Scheduling Priorities
Update Scheduling Priorities/Approval
- Produce Directors Reports for Directors Review from an Allocation Version
Create Proposal
...
Capability (General)
Description | JIRA | Implemented | Last Working | Tested | Status | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
Scientific Justification |
| <Sprint 32 |
Sprint 39
v0.1.2 |
Sprint 39
v0.1.2 |
Persists, can upload, can delete, can replace, can view | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
General Allocation Request | <Sprint 32 |
Sprint 39
v0.1.2 |
Sprint 39
v0.1.2 | Can Select a Facility Can add one or more AR Can delete AR Can rename | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
General Capability Requests |
| < Sprint 32 |
Sprint 39
v0.1.2 |
Sprint 39
v0.1.2 |
Can Delete Can Add Multiples Can Rename | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Import Field Sources, Spectral Specs |
| Sprint 30 |
Sprint 39
v0.1.2 |
Sprint 39
v0.1.2 |
Zeros import. Widget matches columns to headers mostly as excepted (doesn't match units) There are units on the headers at import
HMS DMS doesn't import Units not enforced on widget | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Field Source and Spectral Specs |
| < Sprint 30 |
Sprint 38
|
Sprint 39
v0.1.2 |
Zeros persist in fields Entries persists
Negative Values in Dec DMS entry do not display correctly
Units on fields Precision
GBT missing field of view shape text entries and labels for non point source requests | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Selection of Calibration Parameters affects STL and OS | Sprint 32 | Sprint 37.3 | Sprint 37.3 |
| |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Calibration Parameters |
| Sprint 32 |
Sprint 39
v0.1.2 |
Sprint 39
v0.1.2 |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Performance Parameters |
| Sprint 32 |
Sprint 39
v0.1.2 |
Sprint 39
v0.1.2 |
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Advanced Tab |
| Sprint 36 |
Sprint 39
v0.1.2 |
Sprint 39
v0.1.2 |
Filtering Works as expected Units exist on fields Angular Resolution is present for VLA Import Widget has units
Import Works as expected; feedback on unsuccessful import (was) great! Now it thinks nothing works when only 1 thing is bad. STT-993
Relationship and hierarchy on Advanced Tab + Performance Parameters
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Science Target List |
| Sprint 32 | Sprint 37.3 | Sprint 37.3 |
Removed from all tabs as it should only accessible to Product Owners and that role hasn't been configured | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Simple partitioning, calibration strategy, and capability specific slew time and requested time calculations |
| Sprint 30 |
Sprint 39
v0.1.2 |
Sprint 39
v0.1.2 |
working but not scientifically checked | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Editing Observation Specification |
| < Sprint 30 | Sprint 37.4 | Sprint 37.4 |
Can add by target Can add by Hardware (Simple) Moving Scans works as expect | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
General Observation Specification |
| Sprint 32 |
Sprint 39
v0.1.2 |
Sprint 39
v0.1.2 |
Times in tabs and summary are reporting consistently Filtering works
Precision on entries
GBT time calculation uses bandwidth instead of spectral resolution. | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
One or more Capability Requests in an Allocation Request can generate one or more Observation Specifications | <Sprint 32 |
Sprint 39
v0.1.2 |
Sprint 39
v0.1.2 |
|
Version Reports
Expand | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Landing PageUpdated 10.12.22 for sprint 39, v0.1.2
Solicitation Creation
Navigation
Create ProposalCapability (General)
|
Misc
Expand | ||
---|---|---|
| ||
Display Precision
|
...