- replace disk
- replace/reseat DIMM
- replace power supply
- NRAO may handle replacement hardware. Drop ship. Spare ourselves?
Hardware
- GPUs? Do we get 1U nodes with room for 1 or 2 Tesla T4 GPUs or 2U nodes with room for 1 or 2 regular GPU?
- 1Gb/s might be enough. 10Gb/s if price is good.
- 30 1U nodes or 15 2U nodes or mix?
- head node with lots of disk
- test head node at NRAO (either CV or NM)
- one PDU or two PDUs? What plug? What voltage? This may very across sites.
- UPS for just the head node and switch?
- environmental monitoring Could the PDU do this?
- rackmount KVM (not remote) and patch cables
- NVMe drives for nodes
- Cabinet Rack Cabinet Rack: Doors front and rear locking with mesh. Width: 19". Height: 42U is most common. Depth: 42" or 48"? Rack must support at least 2,000 lbs static load
- https://greatcabinets.com/product/es-ms/
- https://www.apc.com/shop/us/en/products/APC-NetShelter-SX-Server-Rack-Enclosure-42U-Black-1991H-x-600W-x-1070D-mm/P-AR3100
- https://www.apc.com/shop/us/en/products/APC-NetShelter-SX-Server-Rack-Enclosure-42U-Shock-Packaging-2000-lbs-Black-1991H-x-600W-x-1070D-mm/P-AR3100SP
- PDU: one PDU or two PDUs? What plug? What voltage? This may very across sites.
- UPS: for just the head node and switch?
- rackmount KVM (not remote) and patch cables
- environmental monitoring Could the PDU do this?
- head node with lots of disk
- test head node at NRAO (either CV or NM)
- Switch: 1Gb/s might be enough. 10Gb/s if price is good.
- GPUs? Do we get 1U nodes with room for 1 or 2 Tesla T4 GPUs or 2U nodes with room for 1 or 2 regular GPU?
- 30 1U nodes or 15 2U nodes or mix?
- NVMe drives for nodes
Other
Since we are making our own little OSG, should we try to leverage OSG for this or not? Or do we want to make each POD a pool and flock?
...