Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

Fiscal Year 2021 Planning
Anchor
SRDPPOPFY21
SRDPPOPFY21


Roadmap TargetDescriptionTarget DateGroupPop IDDependenciesNotes

SRAO

Heuristics







VLA Calibration Pipeline

Improved RFI Mitigation for VLA Calibration
SRAO

Wave 3 Implementation
VLA Imaging Pipeline

SRAO


ALMA Imaging PipelineImaging Self Cal (ALMA, maybe VLA)
SRAO


Recalibration

Recalibration
SRAO


Minting of DOIs (Requirements)


Q1SRAO


ALMA Multi-configuration imaging

ALMA Group ImagingQ4SRAO

Probably not complete

Catalog Ingestion and Display


Q2SRAO


SRAO

Operations





ALMA Optimized Cube Imaging

Angular Resolution SpecificationQ2SRAO
5.2.2-15



VLA Standard Calibration

Calibration of Multiband DatasetsQ2SRAO5.
2.2
7-13Pipeline Heuristics (Q1)
Standard Calibration of S-Band observations from the VLAQ3SRAO5.
2.2
7-14

VLA Imaging OperationsPilot Imaging Operations for VLAQ3SRAO5.7-15

CARTA IntegrationPhase 1 CARTA integration with ArchiveQ1SSA6.5
.
-39


Workspaces DeliveryQ2SSA6.5
.
-37

Large Project SupportALFALFAIngest of ALFALFA CollectionQ1SSA6.5
.
-38

VLASS








VLASS 2.1 ObservingVLASS 2.1 Observing CompleteQ1VLASS5.
2.2
7-16

Quick Look Image ProductionVLASS 2.1 QL Imaging CompleteQ2VLASS5.
2.2
7-17

SE Continuum Production




HT Condor for VLASS Continuum ImagesQ1SIS
5.
6.5-3

Demonstrate 100 deg2 of imagingQ1DMS
5.
6.5-45

VLASS SE Imaging Pipeline ReleaseQ2PIPE6.5
.
-30

Demonstrate Operational SE ImagingQ2DMS6.5
.
-46

Production of Validation set of SE ImagesQ4VLASS5.
2.2
7-18

Demonstrate at scale ImagingQ4DMS6.5
.
-47

SE Polarization DevelopmentFull-Pol Primary Beam ModellingQ1ARDG6.5
.
-42


Wide-Field Full Mueller ImagingQ3ARDG6.5
.
-43

VLASS 2.2 ObservingPreparation for VLASS 2.2 OpsQ4VLASS


TTA

Tools


Project InitiationKickoff MeetingQ1TTA

5.

2.3

7-19




Logical Implementation
Logical Architecture Complete
S/W for internal testQ3SSA6.5
.40
-40Follows Integration 1 in TTAT Execution Plan
Implementation through Phase 6

Q4