Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Step 2 successfully reduced the MDS load.  Below is a plot of the MDS load for the week of February 21 to 28th.  It shows the initial load reduction on the 26th Wed. (Feb. 26, 2020) when all VLASS jobs were converted to local cfcache.  The 27th Thu. (Feb. 27, 2020) shows a large spike while a pointed observation was tested , the 28th and Fri. (Feb. 28, 2020) shows steady state after all awproject jobs were either converted to local cfcache or stopped.

...