Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.
Info

This page is a living version of the development road map. On the left side for each wave are the things that we have officially said we were going to do in the concept document. In the middle are user facing things things that we want to make sure we do. It is intended in the sense of "don't forget we wanted to do X". On the right hand side are internal project that we want to do, or technical debt we have incurred that we need to pay off.


Table of Contents
minLevel2

Programatic MilestonesUser Facing CapabilitiesInternal / Technical Debt

Wave 1: 2019 Development / 2020 Deployment

  • VLA Standard Pipeline Calibration (Best Efforts).
  • Calibration Ingestion
  • Image Ingestion
  • VLA Restore Calibrated Data
  • ALMA Restore Calibrated Data
  • Initial ALMA Optimized Imaging

  • Initial Archive and Workspace infrastructure.

Wave 2: 2020 Development / 2021 Deployment

  • VLA Standard Pipeline Calibration (TBD %)
  • Catalog Ingestion and Display
  • Initial VLA Imaging Pipeline
  • Improved ALMA Imaging
  • Large Project Support
  • Catalog Ingestion
  • Implement more metrics for reporting: See SRDP Metrics Definition
  • Ingest and display of Large Project results 
    • Possible Projects: VCS, VLITE
    • ALChEmy
    • The one Claire mentioned
    • Real Fast
  • Resource Authorization
  • Workflow execution as Observer account.
  • Cache System
  • Display of thumbnails for proprietary data
  • Workspace QA system

Wave 3: 2021 Development / 2022 Deployment

  • Time Critical Product Generation
  • VLA Optimized Imaging
  • Recalibration
  • Minting of DOIs
  • ALMA Multi-configuration imaging


Wave 4: 2022 Development / 2023 Deployment

  • VLA Standard Imaging Pipeline


Wave 5: 2023 Development / 2024 Deployment

  • VLA Multi-configuation Imaging