Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

Therefore the following criteria should be used for SRDP:

...

  • If total bandwidth =< 2GHz and C-band or above (i.e. purely 8-bit, not 3-bit or mixed 3-bit/8-bit), check the proposal abstract to see if the primary aim is continuum or spectral line (feel free to double-check with a Stage 2 Reviewer if unsure).
  • Currently L-band and S-band are non-SRDP. If/when they are eventually added to SRDP, use the following criteria:
    • for L-band: at least 1 GHz of total bandwidth and no individual basebands < 500 MHz
    • for S-band: at least 1 GHz of total bandwidth, and no individual basebands < 1000 MHz in L-band.

Action items

  •